Similar Projects
Holmes Road Improvements, Blue Ridge Boulevard to 137th Street - 89008543 - City of Kansas City
Infrastructure
Conception
$500,000 CJ est. value
Kansas City, MO 64131

Longview Tract by The Bay Water Park - City of Kansas City
Infrastructure
Conception
$315,000 CJ est. value
Kansas City, MO 64134

Uptown Lofts Part Two / Kansas City
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Kansas City, MO 64111

Pacific + Troost Residential
New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Kansas City, MO 64106

Whittaker Facade Prospectus
Renovation
Post-Bid
$30,000,000 to $50,000,000 est. value
Kansas City, MO 64106

RFQ D/B - 63rd St. Reconst. (Sec 1) - Woodland Ave to Prospect Ave
Infrastructure
Post-Bid
$7,100,000 CJ est. value
Kansas City, MO 64133

10th Floor at the Jackson County Courthouse
Renovation
Results
Kansas City, MO 64106

Construction Manager at Risk - City Hall Garage and South Plaza Restoration
Renovation
Results
Kansas City, MO 64106

AC Rialto Hotel
Renovation, Infrastructure - 169,000 SF
Construction
$65,700,000 CJ est. value
Kansas City, MO 64106

D/B-Design Build Services for a New Detention Center Facility
LEED Certification, New Construction, Infrastructure
Construction
$256,500,000 CJ est. value
Kansas City, MO 64133

Take 5 Oil Change / Blue Springs
New Construction, Infrastructure - 1,415 SF
Pending Verification
$350,000 CJ est. value
Blue Springs, MO 64015

Origin Kansas City Hotel
New Construction, Infrastructure
Pending Verification
$29,000,000 CJ est. value
Kansas City, MO 64120

Reconstruction of sidewalks and curbs - 390258 - City of Kansas City
Infrastructure
Conception
$580,000 CJ est. value
Kansas City, MO 64113

Grand Boulevard Transit-Oriented Development
New Construction, Infrastructure - 193,700 SF
Design
$55,000,000 CJ est. value
Kansas City, MO 64106

Gabriel Tower Apartments
Build-out, Renovation, Infrastructure - 101,646 SF
Post-Bid
$10,000,000 CJ est. value
Kansas City, MO 64127

Last Updated 06/01/2023 11:21 AM
Project Title

City Hall - Core and ADA - City of Kansas City

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64106   (Jackson County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2019
Bids Due View project details and contacts
Estimated Value $2,128,802 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

An overall improvement to the City Hall life safety system had been an unfunded priority for several years. This funding would continue to assist the General Services Department with remaining phases of improvements: elevator upgrades, ceiling repairs, atrium maintenance along with dealing with ADA needed modifications. This project is in the conceptual phase. As of September 10, 2018, this project is included in the City of Kansas 2019-2023 CIP and construction is projected for 2018-19. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents