Similar Projects
Emergency Pipe Repairs
Bidding
Toms River, NJ 08753

Water Meter Replacement Project
Post-Bid
Point Pleasant Beach, NJ 08750

Cold Water Waterproof Magnetic Flow Sensor Meters with Capabilities With ECR and AMR Encoder Type Remotes and AMI Smartpoint Radio Units
Post-Bid
Bayville, NJ

2019 Neptune Water Meter Acquisition
Results
Jackson, NJ 08527

2019 Sensus Water Meter Acquisition
Results
Jackson, NJ

2019 Water Meter Equipment Project
Post-Bid
Beach Haven, NJ

Furnishing and Delivering of Cold Water Meters
Term Contract
Results
Lakewood, NJ 08701

Emergency Pipe Repair Services
Term Contract
Post-Bid
Toms River, NJ 085753

Breton Woods, Section 1 Water Main Replacement
Results
Brick, NJ 08723

Purchase of Water Meters/Meter Reading Equipment
Post-Bid
Barnegat, NJ 08005

Wave Street Water Main Reconstruction
Results
Beachwood, NJ 08722

Maple Avenue and Lake Avenue Water Main Improvements
Post-Bid
$180,000 est. value
Island Heights, NJ 08732

2018 Water Main Replacement Project
Results
Island Heights, NJ 08732

Furnish and Deliver Various Pipe and Fittings
Post-Bid
NJ

2017 Water Main Replacement Project
Results
Beach Haven, NJ

Reported 08/30/2019 12:00 AM
Project Title

Radio Road 0.3 MG Standpipe Rehabilitation

Physical Address View project details and contacts
City, State (County) Little Egg Harbor, NJ 08087   (Ocean County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 07/29/19
Owner View project details and contacts
Architect View project details and contacts
Description Interior Cleaning (near white blast), Interior coating system (three coats); Exterior Cleaning (commercial blast), Class 2 A Containment, Exterior coating system (three coats), Exterior Logo; Repair/replace anchor bolts as needed; Remove and replace loose grout to seal foundation (Sikaflex 1A); Install 30" diameter shell manhole with davit arm (opposite side of the existing); Remove and replace existing ladder with OSHA compliant ladder; Install flexible cable safety climb device on new shell ladder; Install eight (8') aluminum ladder guard 16' above grade; Modify 6" overflow to discharge 12" above grade stainless steel screen (air gap); Install OSHA compliant roof handrail; Modify roof rain lip to 6"; Remove Existing roof ladder and replace with handrail enclosed staircase; Remove 14" roof vent and replace with 24" flanged vent neck and 18" aluminum pressure vacuum vent; Demolition of existing block wall and installation of new reinforced concrete retaining wall. New wall shall accommodate all existing penetrations; Install new 8' chain link fence on top of new retaining wall; Grind interior remnants of painter couples flush on the interior roof; seal welds or caulk voids (Sikaflex 1A); Caulk all overlaps 1/2 or less (Sikaflex 1A) Grind 2" by 2" patch plates flush and repair welds as necessary on the exterior roof; Install eight (8) roof scaffold rigging openings with plugs; Low voltage holiday testing shall be performed to all interior surfaces; and Bacteria testing and V.O.C.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents