Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Post-Bid
$25,000 to $100,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Post-Bid
$25,000 to $100,000,000 est. value

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

Roofing, Facade, and Building Envelope Engineering and Design Services
Alteration
Design
$2,500 to $6,000,000 est. value

Regional A-E Environmental Services
Renovation, Term Contract
Bidding

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Geotechnical Engineering Services
Results
$500,000 to $2,000,000 est. value

Design Services for Highway Structures and Bridges
Term Contract
Bidding
$3,000,000 est. value

A-E and Design Services for Industrial and Research Facilities
Post-Bid
$5,000,000 to $75,000,000 est. value
Washington, DC

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Last Updated 12/01/2021 10:49 AM
Project Title

Improve and Replace Technology Infrastructure

Physical Address View project details and contacts
City, State (County) Petersburg, VA   (Chesterfield County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A. Refine, clarify, and define the Agency’s project description, data, and requirements as necessary to develop a Schematic design of the project which meets the Agency’s requirements and is within the stipulated “design-not-to-exceed” construction budget. Respond to all DEB and other agency review comments and resolve outstanding design issues at the various phases by taking appropriate action in the design of the project. B. Develop a Preliminary Design submission consistent with the requirements of the A/E Manual. Respond to all DEB and other agency review comments and resolve outstanding design issues prior to submission of construction documents. C. Provide complete construction contract documents with professional seals and signatures in accordance with the procedures of the A/E Manual. Documents should be complete and ready for bidding not later than May 1, 2022. D. Assure that the construction contract documents are in conformance with generally accepted architectural and engineering practices and comply fully with all applicable codes and regulations including, but not limited to, the Virginia Uniform Statewide Building Code, and the accessibility standards referenced in the CPSM. E. Provide specifications which reflect current requirements, standards and product availability. F. Develop and prepare construction documents for an Erosion and Sediment Control Plan and a Stormwater Management Plan. Obtain approvals from required Agencies. G. Coordinate design with and obtain approval from the Virginia State University Capital Outlay and Technology Services offices. H. Coordinate the design of utility connections with local utility provider and obtain necessary approvals. Agency will pay filing fees and connections charges, as required. I. Prepare A/E cost estimates for the project per the A/E Manual. J. Represent the Agency by presenting necessary oral and/or graphic presentations to State Agencies such as the Art and Architectural Review Board, the Division of Engineering and Buildings or any other group having interest in the project. K. Complete all forms and documents in formats required by the A/E Manual and process in accord with the Agency's instructions. L. Provide services to assist the Agency in the bidding and award of the construction contract. M. Provide full time, dedicated onsite Project Management services for the construction phase for the administration of the contract. Refer to the CPSM Section 7.6.4.2 Owner’s Designated Representative for specific responsibilities. The University will provide office space for the construction administrator. N. During construction, participate in meetings as needed to review the work status, the schedule, any proposed change orders, etc. O.Analysis of current technology outside plant infrastructure, network equipment and technology teaching tools and providing recommendations for best practices for system reliability, sustainability and redundancy as well as coordination with current and future facilities as shown on the campus Master Plan.

Details

Architectural, New Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents