Similar Projects
Last Updated | 08/03/2022 07:33 PM |
Project Title | Airport Road Reconstruction Project Roadway and Drainage Phase I |
Physical Address | View project details and contacts |
City, State (County) | Milan, NM 87021 (Cibola County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected July 2022, |
Bids Due | View project details and contacts |
Estimated Value | $2,634,881 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For the Airport Road Reconstruction Project Roadway and Drainage Phase I. Project consists of pedestrian access roadway and drainage improvements including full roadway reconstruction, new storm drain installation, concrete sidewalk, concrete barrier curb and gutter, concrete drive pad, valley gutter, permanent signing and striping, and ADA access ramps all located within the Village of Milan, NM. Bidder Requirements: A.Bidders must possess appropriate contracting license (GA-98 and GF-98 or other satisfactory classification) as regulated by Construction Industries Division, 2550 Cerrillos Road, Santa Fe, NM 87505, Phone: (505) 476-4700. B.Resident/Veterans bidder's preference are eligible. Each proposal shall be submitted in accordance with the information for bidders and shall be accompanied by an acceptable Proposal Guarantee in the form of a Bid Bond or Certified Check in the amount equal to five percent (5%) of the total bid amount, made payable to Village of Milan, as a guarantee that if the proposal is accepted, the bidder will execute the Contract and file acceptable Performance and Labor and Material Payment Bonds within ten (10) calendar days after award of the Contract. The Village of Milan reserves the right to reject any or all proposals and to waive any informality or technicality in any proposal. Decisions of the State Labor Commissioner setting wage rates will be a part of the Contract. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |