Similar Projects
MCAWRRF In-Plant Clarifiers and Lime Silo Demolition
New Construction
Bidding
Charlottesville, VA

BHTP Transmission Force Main Section 1 - Subaqueous Portion
New Construction
Bidding
Virginia Beach, VA

Preventive Maintenance Program
Post-Bid
Portsmouth, VA

Secondary Clarifier Drive Repair - CETP
Post-Bid
Virginia Beach, VA

Crozet Water Treatment Plant - Expansion and Rehabilitation
Results
$7,170,000 est. value
Charlottesville, VA

Building J Facilities Relocation and Decommissioning
New Construction, Renovation, Demolition - 47,000 SF
Results
$18,389,700 est. value
Alexandria, VA 22314

Shenandoah Valley Organic Packaging Plant Expansion
New Construction - 132,600 SF
Pending Verification
$10,000,000 CJ est. value
Harrisonburg, VA 22802

Nansemond Treatment Plant Advanced Nutrient Reduction Improvements Phase II(NP013820)
New Construction
Bidding
Suffolk, VA 23435

2020 Waterworks Improvements Phase II Project
Post-Bid
Radford, VA

19-294-ITB Dewatering Polymer
Results
Arlington, VA 22201

Primary and Secondary Sustaining Project 1
New Construction
Bidding
$70,000,000 to $75,000,000 est. value
Lorton, VA 22079

On Call Materials and Construction Related Testing Services
Term Contract
Post-Bid
Winchester, VA 22601

Water Pollution Control Facility Aeration System Replacement and Upgrade
Results
Less than $50,000 est. value
Leesburg, VA 20175

Design-Build for Project Moss 3 Reclamation Project
New Construction
Bidding
Cleveland, VA

Filter Media and Silica Sand Removal in Equalization Basin
Post-Bid
Norfolk, VA 23502

Last Updated 06/28/2021 10:42 AM
Project Title

Elevated Platform Mezzanine Furnish and Install - ABTP

Physical Address View project details and contacts
City, State (County) Hampton, Norfolk, VA 23505 (Hampton City, Norfolk City Counties)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, equipment, materials, and supervision required to furnish and install an elevated platform mezzanine for the Army Base Treatment Plant located at 401 Lagoon Rd, Norfolk, VA 23505 in accordance with the attached specifications.

Details

Water Treatment Plant, Addition.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents