Similar Projects
Engineering Services for Route Z Widening and Signalization
New Construction, Infrastructure
Bidding
Wentzville, MO

Resurfacing, Signing, Guardrail, and Concrete barrier
Infrastructure
Bidding
$5,000,000 to $7,000,000 est. value

Sidewalk and Drainage Improvements
Infrastructure
Post-Bid
Saint Charles, MO

Parks Asphalt Paving
Infrastructure
Post-Bid
Foristell, MO 63348

City Hall Parking Lot Maintenance and Improvements
Results
Weldon Spring, MO

2021 District Concrete
Results
Dardenne Prairie, Lake Saint Louis, O'Fallon, Wentzville, MO 63385

Pinkerton Properties Warehouse
New Construction, Alteration - 24,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
O'Fallon, MO 63366

Chicken N Pickle
New Construction, Term Contract - 32,923 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Saint Charles, MO

Asphalt Removal and Replacement
Infrastructure
Post-Bid
Cottleville, MO

Pavement Sealing and Striping of Justice Center and Water Treatment Facilities Parking Lots
Results
Saint Peters, MO

Implementing Traffic Control Signaling Devices and Roadway Improvements
Infrastructure, Alteration
Post-Bid
Wentzville, MO

Great Oaks Turn Lane Addition
Infrastructure
Results
Wentzville, MO

Muegge Road
New Construction, Infrastructure
Post-Bid
Saint Charles, MO 63302

Hanley Road Reconstruction and Improvements
Infrastructure
Results
Dardenne Prairie, MO

Little Hills Expressway and Mel Wetter
Infrastructure
Post-Bid
Saint Charles, MO

Last Updated 01/20/2022 12:54 PM
Project Title

Route I-70 South Outer Road Phase 2

Physical Address View project details and contacts
City, State (County) O Fallon, MO   (Saint Charles County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work includes: Removal of Improvements, Concrete and Asphalt Pavement, Sidewalk, Curb Ramps, Aggregate Base, Coldmilling, Earthwork and Grading, Erosion Control, Pavement Marking, Utilities, Guard Rail, Street Lighting, Street Signs, ITS, Traffic Barrier, and MSE Wall needed for construction of the I-70 South Outer Road Project Phase 2.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Exterior Lighting, Roadway Lighting.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents