Similar Projects
West Holyoke Water Storage Tank
Bidding
Less than $2,550,000 est. value
Holyoke, MA 01040

1.15 MG Hill Street Water Storage Tank
Bidding
$2,350,000 est. value
Foxborough, MA 02035

Operation and Maintenance of the Hingham Water System
Term Contract
Post-Bid
Hingham, MA

Maintenance, Repair, Modification and Asset Management of Water Storage Facilities
Post-Bid
Less than $3,500,000 est. value
Wareham, MA

Replace Four UST (Underground Storage Tank) Spill Buckets
Results
$10,000 to $25,000 est. value
Bedford, MA 01731

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Champion City Recovery - Rail Tarping Station Replacement
New Construction
Pending Verification
Brockton, MA 02301

Knoll Road and Wing Road Water Storage Tanks Cleaning and Painting
Bidding
$330,000 est. value
Lynnfield, MA 01940

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Extended Rehabilitation, Maintenance, Repair, Modification And Asset Management Services for Asnebumskit Water Storage Tank
Results
Less than $10,000 est. value
Paxton, MA 01612

Communication Facilities Build-out for Ellis Road Water Tank
Post-Bid
Less than $200,000 est. value
Westminster, MA 01473

Replace Underground Storage Tank (UST) Spill Bucket and Sump
Results
Less than $25,000 est. value
Bedford, MA 01731

Greenway Road Tank Rehabilitation
Post-Bid
$872,649 est. value
Mashpee, MA 02649

Z--CACO Marconi Water Tower Repair and Painting
Results
$250,000 to $500,000 est. value
Wellfleet, MA

Inspection, Maintenance, Repair, Modification and Asset Management of Water Storage Facilities
Post-Bid
Millis, MA

Last Updated 01/06/2021 12:44 PM
Project Title

OWS Tank Cleaning Services

Physical Address View project details and contacts
City, State (County) Westfield, MA 01085   (Hampden County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

0001 Base Year – Perform tank cleaning service in accordance with (IAW) section 5 of the SOW dated 15JUNE20. Period of Performance (PoP) is 12 months. 1 Job 0002 Base Year - Contractor Manpower Reporting Application (CMRA) requirement – (see section 5.8 in the PWS dated 15JUNE20). PoP 12 months. 1 EA 1001 Option Year 1 - Perform service IAW CLIN 0001. PoP is 12 months. 1 Job 1002 Option Year 1 - CMRA requirement - IAW CLIN 0002. PoP 12 months. 1 EA 2001 Option Year 2 - Perform service IAW CLIN 0001. PoP is 12 months. 1 Job 2002 Option Year 2 - CMRA requirement - IAW CLIN 0002. PoP 12 months. 1 EA 3001 Option Year 3 - Perform service IAW CLIN 0001. PoP is 12 months. 1 Job 3002 Option Year 3 - CMRA requirement - IAW CLIN 0002. PoP 12 months. 1 EA 4001 Option Year 4 - Perform service IAW CLIN 0001. PoP is 12 months. 1 Job 4002 Option Year 4 - CMRA requirement - IAW CLIN 0002. PoP 12 months. 1 EA (vi) Description of Requirement: The contractor shall provide all management, tools, supplies, equipment, and labor/manpower and appropriate license(s)/qualification(s) necessary to perform pump out and cleaning services of pump and clean a 10,000 gallon Oil/Water separator and a 1,000 gallon fuel/product recovery tank and remove sludge from and clean twelve (12) separate concrete trench drains at the base bulk fuel facility as outlined in Section 5 of the PWS dated 25AUG20.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents