Similar Projects
Carlton County Jail
New Construction - 55,200 SF
Design
$34,000,000 est. value
Carlton, MN 55718

1710 Plymouth 5th Floor Restoration
Alteration
Bidding
$80,000 est. value
Minneapolis, MN 55411

2022 Masonry Restoration - Phase 3 at Men's Adult Correctional Facility
Renovation
Bidding
$490,000 est. value
Plymouth, MN 55447

Northrop Community Education Flooring Project
Post-Bid
Rochester, MN 55901

Resinous Concrete Floor Coatings
Term Contract
Post-Bid
MN

NCC-21-Gymnasium Abatement and Floor Replacement
Results
$250,000 est. value
Bloomington, MN

Granite and Tile Installation and Maintenance Services
Term Contract
Results
MN

Carpet and Resilient Flooring
Term Contract
Post-Bid
MN

ACF Men's Campus Updates
Renovation
Results
Plymouth, MN 55447

2021 Carpet and Other Flooring Replacement
Post-Bid
Apple Valley, Rosemount, MN 55124

Replace Two Elevators at MCF - General
Renovation
Results
$944,835 est. value
Moose Lake, MN 55767

Resinous Concrete Floor Coatings
Term Contract
Post-Bid

Gymnasium Floor Replacement
Results
$100,000 to $200,000 est. value
Bloomington, MN

2021 Carpet Replacement at ADC
Post-Bid
Hastings, MN 55033

Law Enforcement Center 3100 & 7100 Cell Block Upgrade
Renovation
Results
$500,000 est. value
Hastings, MN 55033

Last Updated 05/25/2022 01:06 AM
Project Title

2nd Floor Stairwell Floor Infill and Remodel IT Room at Minnesota Correctional Facility (MCF) - Stillwater

Physical Address View project details and contacts
City, State (County) Bayport, MN 55003   (Washington County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Flooring, Prison/Jail
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $399,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work included in the contract. 1.) Demolition of stairwell spaces. 2.) Repairs at first floor stairwell. 3.) New construction of IT Room at second floor: Infill floor, new wall and doors, modify windows, modify existing HVAC, add new A/C units, add new fire protection, add new lighting and power.

Details

Prison/Jail, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents