Similar Projects
Convention Center Expansion - 6020.119 - City of Austin
Addition, Infrastructure - 321,700 SF
Conception
$14,234,396 CJ est. value
Austin, TX 78701

Slaughter Lane - West of S Congress to Bluff Springs Rd - 11890.011 - City of Austin
Infrastructure
Conception
$4,156,730 CJ est. value
Austin, TX 78748

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Remedial Repair Attoyac Bayou Site 21
Infrastructure
Design
$250,000 CJ est. value
Nacogdoches, TX 75961

Stormwater Detention Pond Remediation Project at ACC Service Center
Post-Bid
Austin, TX 78754

William Cannon Drive Phase 3
Infrastructure
Post-Bid
$370,000 CJ est. value
Austin, TX 78745

Flatwork and Drainage Improvements
Infrastructure
Results
$46,000 est. value
Sunset Valley, TX 78745

Hydro Excavation Services
Infrastructure
Results
Austin, TX

Capitol Complex, Phase 2
New Construction, Infrastructure
Construction
$225,000,000 CJ est. value
Austin, TX 78701

BCRUA Phase 2 Raw Water Delivery System
Infrastructure
Construction
$224,786,835 CJ est. value
Cedar Park, TX 78613

Dutch Bros Coffee TX1202 / Austin
New Construction, Infrastructure - 871 SF
Pending Verification
$250,000 CJ est. value
Austin, TX 78754

Engineering Discovery Building - CMAR
New Construction, Infrastructure
Pending Verification
$169,650,000 CJ est. value
Austin, TX 78712

Shoal Creek - MoPac/Steck Water Quality Ponds Retrofit - 5282.156 - City Of Austin
Alteration
Conception
Less than $695,000 est. value
Austin, TX 78799

1418 Frontier Valley Multi-Residential
New Construction, Infrastructure - 69,700 SF
Design
$12,500,000 CJ est. value
Austin, TX 78741

Travis County Correctional Complex New Evidence Warehouse
New Construction, Infrastructure - 18,800 SF
Post-Bid
$5,900,000 CJ est. value
Del Valle, TX 78617

Last Updated 06/14/2023 10:19 AM
Project Title

Senna Hills MUD Effluent Storage Pond Liner Replacement

Physical Address View project details and contacts
City, State (County) Austin, TX 78733   (Travis County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,149,423 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of installation of temporary effluent management, removal of the existing liner, and installing a new 152,000 square foot liner for existing effluent pond. Bids must be accompanied by a bid bond with Power of Attorney attached or cashier's check of five percent (5%) of the total amount bid (sum of all bid items) made payable to Senna Hills M.U.D. Bidders should read and understand all terms and conditions contained in the Contract Documents. Contract Time is of the essence and all Work shall be substantially completed within 90 calendar days after the Notice to Proceed. Liquidated damages are $500 per calendar day. A Bid which, in the opinion of OWNER's staff, deviates from the Contract Documents, and which has not been clarified through a written Addendum prior to Bid submittal deadline, shall be considered an exception to the Contract Documents and grounds for the Bid to be rejected. Owner reserves the right to reject any or all Bids and to waive any informalities and irregularities in Bids received. OWNER reserves the right to reject any or all Bids and to waive any informalities and irregularities in Bids received. The deadline to ask questions is 4/27/2022 11:50 PM CDT The project shall consists of the following: - Diverting effluent delivery to the pond at the wastewater treatment plant, add temporary holding tanks and temporary pumping to effluent irrigation system. - Removal and disposal of existing pond liner. - Earthwork and grading of existing pond slopes/bowl, to establish smooth side slopes. - Installation of new geotextile fabric and liner. - Removal and replacement of rescue ropes. - All other work and materials shown on the drawings and/or specifications or as otherwise described to provide a satisfactory effluent pond liner. This work is to be done in coordination with the ongoing operations and maintenance of the Inframark Water and Infrastructure Services and effluent irrigation of Senna Hills M.U.D., which must be kept in operation and secure from intruder access. No disruptions to the operations of the Treatment Plant or Effluent Pond will be allowed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents