Similar Projects
Walthall Schools Renovation Projects
Renovation
Conception
Tylertown, MS

South Delta School District ESSER 2 and South Delta High School Gym Lobby Renovation
Renovation
Bidding
Rolling Fork, MS 39159

Picayune Early Head Start, Phase II
Renovation
Bidding
Picayune, MS 39466

General Construction - Long Beach School District Hurricane Repairs
Post-Bid
Long Beach, MS 39560

New Classroom
New Construction
Post-Bid
Moss Point, Vancleave, MS 39562

Boyd Elementary School Restroom Renovations
Renovation
Results
Jackson, MS 39206

Smith Elementary School Renovations
Renovation
Results
Jackson, MS 39213

New Construction and Renovation for the Brookhaven School District
New Construction, Renovation, Addition - 6,399 SF
Construction
$4,000,000 to $5,000,000 est. value
Brookhaven, MS 39601

Restoration to Isaac Chapel Rosenwald School
Renovation
Construction
$425,000 est. value
Byhalia, MS 38611

Regents School Of Oxford
New Construction
Pending Verification
Oxford, MS

2021 Renovations
Renovation
Bidding
Bay Springs, MS

Carver Elementary School Renovation and Additions
Renovation, Addition
Post-Bid
Bassfield, MS 39421

Sykes Elementary School Renovations
Renovation
Results
Jackson, MS 39212

Nora Davis Elementary Additions and Renovations
Renovation - 49,429 SF
Construction
$13,760,000 est. value
Laurel, MS 39440

Elementary and Middle School Additions
Addition
Bidding
Enterprise, MS

Reported 03/10/2022 12:00 AM
Project Title

Renovations to Wells APAC Elementary School

Physical Address View project details and contacts
City, State (County) Jackson, MS 39202   (Hinds County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project Scope 1. Base Bid Scope A. Renovation to Ida B. Wells APAC School: 1. New Front Lobby 2. Interior Renovations to Auditorium: New Flooring, Painting, New Seating, New Stage Curtain, New Seating, New Blackout Shades, New Acoustical Wall Panels, New Sound Booth, New Lighting, Sound Equipment and HVAC. 3. Renovations to Existing Faculty, Boy’s and Girl’s Restrooms 4. Sidewalk Repairs Alternate #1 1. New Restroom Building in Rear Courtyard Alternate #2 1. Demolition of Wooden Walkways/Stairs, Construction of New Raised Aluminum Walkways, Stairs, and Ramps at Existing Portable Buildings; Site Repair Around Portable Buildings The approximate sq footage of the renovation area is: 2,375 sq ft The approximate sq footage of the new construction (lobby) is: 245 sq ft The approximate sq footage of the new construction (restrooms, alternate #1) is: 990 sq ft The approximate sq footage of the new construction (raised platforms, alternate #2) is: 11,326 sq ft

Details

24,701 SF - Elementary School, 2,375 SF Renovation, Elementary School, 12,561 SF New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents