Similar Projects
Red Sky Ranch
New Construction
Conception
Norman, OK 73072

The Lakes At Rabbit Run - Phase 2
New Construction
Design
Broken Arrow, OK 74011

Abbott Farms III
New Construction
Design
Owasso, OK 74055

Rebid 3 - Housing Rehabilitation Repairs - Sequoyah County
Renovation
Bidding
$25,000 CJ est. value
Sallisaw, OK 74955

Rebid 3 - CN Protecting Our Vulnerable Drywall & Finish, Flooring, Paint & Finish and Plumbing
Renovation
Bidding
$30,000 CJ est. value
Muldrow, OK 74948

4 Bedroom Unit
New Construction
Post-Bid
Newalla, OK

Fire Restoration of Unit #1703, located in Fairview Village
Renovation
Post-Bid
Elk City, OK

Redevelopment of an Approximately 1.9-Acre Tract of Land
New Construction
Results
Oklahoma City, OK 73195

Housing Rehabilitation Program
Renovation
Results
Muskogee, OK

Twin Lakes Estates
New Construction
Construction
Noble, OK 73068

Gabe's Crossing
New Construction
Construction
Mustang, OK 73064

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

Village At 1Eleven
New Construction
Pending Verification
Broken Arrow, OK 74011

Cordillera Ranch
New Construction
Design
$32,000,000 est. value
Oklahoma City, OK 73141

Mobile Homes, Including Delivery and Setup
Renovation, Infrastructure
Bidding
$20,000 CJ est. value
Tahlequah, OK 74464

Last Updated 10/05/2022 07:33 PM
Project Title

CN Protecting Our Vulnerable Carpentry, Ramp, Window Repair, HVAC & Roofing

Physical Address View project details and contacts
City, State (County) Sallisaw, OK 74955   (Sequoyah County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $20,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Housing Authority of the Cherokee Nation is seeking bids from interested parties for the rehabilitation of one home located in Sequoyah County. Work will be completed according to the work write-up. The home has previously tested positive for LBP. LBP Clearance Test attached. This job must be completed in 45 working days. Work should begin within one week of notification or $100.00 will be charged for liquidated damages to the contractor for each working day of extension over the contract end date. To be considered a responsive/responsible bidder, the Mandatory Bid Response sheet and the Bid Form must be fully completed. To receive preference, bidder must be TERO certified through the Cherokee Nation Tribal Employment Rights Office; proof of certification must accompany submittals. Successful bidder will be obligated to comply with Tribal rules and regulations and TERO. Contractor accessing an occupied unit: Any Contractor doing work on behalf of the HACN that needs to enter an occupied unit to complete the job shall wear face covering while inside the unit. HACN reserves the right to reject any and all bids.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents