Similar Projects
Delaware County Junior Fair Building Upgrade
Post-Bid
$3,300,000 est. value
Delaware, OH

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Solon Parkside Elementary and Middle School HVAC Improvements Phase III
Results
$245,000 est. value
Solon, OH

Morehouse Pavilion AHU1 Replacement - Design-Build
Results
$1,216,000 est. value
Columbus, OH

Air Handler Replacements
Post-Bid
Less than $1,500,000 est. value
Dayton, OH

Wilmington High Rise Chiller Replacement
Results
Dayton, OH 45390

Design / Installation - Vehicle Exhaust Removal Systems at Two Fire Stations
Post-Bid
Monroe, OH 45050

Health Department Building Replacement of Package HVAC Unit and Controlling System
Results
Sidney, OH

Exterior Envelope Repairs and HVAC Upgrades of Building 1 at the Cincinnati Job Corps Center, Cincinnati, Ohio
Post-Bid
$1,000,000 to $5,000,000 est. value
Cincinnati, OH 45214

HVAC Unit(s) Installation at Family Support Center 2018.
Results
Batavia, OH

Cincinnati VA Medical Center's: Aircuity Optinet System
Post-Bid
Cincinnati, OH 45220

Cuyahoga County Justice Center Complex - CPDHQ Building HVAC System Renovation
Results
Less than $592,494 est. value
Cleveland, OH

J--Aircuity Service Contract This Sources Sought is Issued to Identify Capable and Interested Vendors that have the Ability to Preform the Work in the PWS.
Post-Bid
Cincinnati, OH 45220

HVAC Maintenance
Term Contract
Results
Springfield, OH

Paint Contractors/Spec Writer(s)/General Contractors /Sub Contractors/ Plumbers/Electricians/HVAC/Roofers
Post-Bid
East Cleveland, OH 44110

Reported 12/01/2018 12:00 AM
Project Title

HVAC Rooftop Unit Replacement at Neighborhood Ministries - Rockford Village

Physical Address View project details and contacts
City, State (County) Youngstown, OH   (Mahoning County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Reclaim refrigerant. Disconnect gas. Disconnect electrical high and low voltage Remove any roof mounts or curb mounts Properly connect lifting cables or straps to HVAC unit Remove HVAC unit from roof Crane new HVAC unit to roof, seating it on existing curb Ensuring a leak- tight seal. Reconnect all electrical, gas , and low voltage Complete start up and test system. All work must be competed in accordance with local code HVAC permit must be obtained.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents