Similar Projects
Greenwood Stormwater Basin
Post-Bid
Niles, IL 60714

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

I-19-4476 Roadway and Bridge Widening and Reconstruction
Results
$25,000,000 to $50,000,000 est. value
IL

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

2021 Road Maintenance Program
Post-Bid
Inverness, IL

Sidewalk, Curb
Results
Hanover Park, IL

Street Resurfacing Program
Renovation
Post-Bid
Mount Prospect, IL

2021 Crack Routing and Sealing
Results
Hanover Park, IL

Site Paving
Post-Bid
Elgin, IL 60120

2021 Street Improvement Program
Results
Less than $464,820 est. value
Morton Grove, IL

2021 Paving Work at Conant, Fremd, Hoffman Estates, Palatine and Schaumburg High Schools
Post-Bid
Palatine, IL

Hart Road and Main Street Water Main Replacement
Results
Less than $563,165 est. value
Barrington, IL

HMA Resurfurfacing
Post-Bid
IL

Pavement Resurfacing
Results
Less than $2,760,387 est. value
Palatine, IL

Niles West High School 2021 Paving and Sealcoating
Post-Bid
Skokie, IL 60077

Last Updated 07/19/2022 01:51 AM
Project Title

City Hall Parking Lot Green Infrastructure Paving Improvements

Physical Address View project details and contacts
City, State (County) Burbank, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of the reconstruction of an existing parking lot (1400 S.Y.+/-) with Green Infrastructure improvements including: earth excavation, hot-mix asphalt surface removal, permeable paver, permeable aggregate base course, underdrain pipe, concrete curb and gutter, sidewalk, and driveway pavement removal and replacement, structure adjustments, restoration, and all appurtenant construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents