Similar Projects
Violet Trail Crown - North Phase 2A
Infrastructure
Bidding
$1,500,000 est. value
Austin, TX

Upper Brays Bayou Greenway (BR 26) - Braeburn Glen Boulevard to Eldridge Parkway
Post-Bid
$10,750,000 to $11,100,000 est. value
Houston, TX 77074

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Renovation of the Johnson County Burleson Sub-Courthouse Parking Lot
Results
$250,000 est. value
Burleson, TX 76028

Sidewalk Improvements 2019
Results
Terrell, TX 75160

Elmside/Woodchase Path
Results
$2,900,000 to $3,300,000 est. value
Houston, TX 77042

RM 12/FM 2439 Intersection Improvements
Results
$472,267 est. value
San Marcos, TX 78666

City of Copperas Cove - The Narrows Sidewalks
Results
Less than $1,640,000 est. value
Temple, TX 76522

Barbara Drive Drainage Phase 2
Results
Less than $5,852,000 est. value
San Antonio, TX 78200

Construction of New Parking Lot at the Michael Talbott Service Center
Results
Less than $555,400 est. value
Houston, TX 77002

Parking Upgrade and Sidewalk Replacement
Results
Mexia, TX 76667

2017 Bond Program Pedestrian Mobility and Streets TOC Package 9
Results
$4,000,000 est. value
San Antonio, TX 78205

Reconstruction of Pedestrian Sidewalks in the Manchester Area for Harris County Precinct 2
Results
Houston, TX

Southcross Blvd (I-37 to I-35)
Results
$2,520,000 est. value
San Antonio, TX 78200

Pedestrian Traffic Rail
Results
Less than $60,650 est. value
College Station, TX

Reported 08/14/2021 12:00 AM
Project Title

Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Weslaco, TX   (Hidalgo County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Weslaco will construct sidewalk improvements at various locations throughout the city. The 5’ sidewalks will connect areas of need for pedestrians and may also include ADA compliant curb ramps. There are some areas that require maintenance and sidewalks may be replaced. Work orders for sidewalk improvements will be assigned to the contractor and costs will be based on unit bid prices for the proposed work. Ample time will be provided for the contractor to substantially complete the each work order.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents