Similar Projects
Rock Removal - Boston Harbor Federal Navigation
Post-Bid
$75,000,000 to $150,000,000 est. value
Boston, MA

Detention Pond Dredging
Post-Bid
Less than $80,000 est. value
Greenfield, MA 01301

Muddy River Flood Damage Reduction - Phase 2, Boston and Brookline, Massachusetts
Results
$25,000,000 to $100,000,000 est. value
Boston, Brookline, MA

Muddy River Flood Damage Reduction - Phase 2, Boston and Brookline, Massachusetts
Results
$25,000,000 to $100,000,000 est. value
Boston, Brookline, MA

Lake Street Landing Dredge Project
Post-Bid
Tisbury, MA

Plymouth Harbor Dredging
Results
Less than $4,500,000 est. value
Plymouth, MA

Stage Harbor Channel Dredging
Results
Less than $507,500 est. value
Chatham, MA 02633

Wellfleet Harbor Maintenance Dredging
Results
$1,000,000 to $5,000,000 est. value
Wellfleet, MA

Lower Harbor CAD Cell No. 4
Results
Less than $14,500,000 est. value
New Bedford, MA

Boston Harbor Navigation Improvement Project-Phase 3 Rock Removal
Results
$100,000,000 to $250,000,000 est. value
Boston, MA 02128

Butler's Pond Dredging and Storm Water Treatment
Results
Less than $800,000 est. value
Quincy, MA 02169

White Brook and Broad Brook Sediment Basins Maintenance Dredging
Results
Less than $240,000 est. value
Easthampton, MA 01027

2020 Dead Neck Sampson's Island Dredging and Beach Nourishment (Phase 3)
Results
$475,000 est. value
Hyannis, MA 02601

James Thomas Apartments Development Site Improvement Project
Results
Less than $40,000 est. value
Taunton, MA 02780

Little Bay Dredge
Results
Bourne, MA

Reported 03/24/2021 12:00 AM
Project Title

Maintenance Dredging of The Newburyport Harbor, Massachusetts Federal Navigation Project

Physical Address View project details and contacts
City, State (County) Newburyport, MA   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Newburyport Harbor FNP consists of a 9-foot-deep Mean Lower Low Water (MLLW), 200-foot-wide inner harbor channel, and a 15-foot-deep MLLW, 400-foot-wide entrance channel. The proposed work consists of dredging up to approximately 250,000 cubic yards (CY) of sandy material from shoaled areas of the FNP. All areas of the FNP will be dredged to the authorized project depth, plus one-foot allowable overdepth for the 9 foot channel and two feet of allowable overdepth for the 15-foot channel. A hopper dredge or hydraulic pipeline dredge will be used to remove material from the shoaled portions of the channels. The base plan includes approximately 60,000 CY of material placed by pipeline directly on the beach at North Point, which is located just west of the south jetty on the southern shoreline of the Merrimack River at the inlet on Plum Island in Newburyport, and the remainder of the material placed at two nearshore placement locations off of Salisbury Beach and Plum Island Beach. The northern nearshore disposal site, “Salisbury Nearshore,” is located just east of Salisbury Beach, 1.5 miles north of the navigation channel and mouth of the Merrimack River, with a footprint of about 1 mile long and 0.15 miles wide. The southern nearshore disposal site “Plum Island Nearshore,” is located east of Plum Island Beach, 1.2 miles south of the channel and is 0.8 miles long and 0.15 miles wide. Both nearshore sites are located between the 20-foot MLW and 30-foot MLW depth contours.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents