Similar Projects
Silicone Joint Sealer
Infrastructure
Bidding

East/South Highway 25 (CR 25) from S Highway 464 to SE 141st Avenue Road
Infrastructure
Bidding
$616,000 est. value
Ocala, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Rolling Hills Unit 5 Road Improvement Project
Infrastructure
Post-Bid
$200,000 est. value
Ocala, FL 34481

Quiet Zone Improvement - South Ocala (SE 52nd ST, SE 62nd ST, SE 73rd ST, SE 80th ST at RR Crossings)
Results
Less than $502,304 est. value
FL

CR 315 Mill & Resurface (SR 40 to 90th Street Rd)
Results
Less than $1,317,327 est. value
FL

NW 150th Avenue and NW 145th Avenue Road and NW 112th Place Road
Infrastructure
Bidding
$1,141,393 est. value
FL

CR 452 Safety Improvements from CR 44 to Lake/Marion County Line
Infrastructure
Post-Bid

Marion Oaks Pass Resurfacing (Marion Oaks Manor to SW 143rd Street)
Results
Less than $440,000 est. value
Ocala, FL 34473

Roosevelt Village Unit 1 - Road Improvement Project
Infrastructure
Bidding
$825,000 est. value
Ocala, FL

Banyan Road Resurface (from SE 58th Avenue to Almond Road) and SE 4th Place/SE 61st Court (from SE 5th St to SE 3rd Place)
Infrastructure
Post-Bid
$261,420 est. value
FL

NW 77 St Resurfacing (SR 326 to N US Hwy 441)
Results
FL

SW 83 Place Road /SW 189 Court Road (0.25 mi East of SW 196 Avenue Road to SW 190 Avenue Road)
Infrastructure
Bidding
$440,000 est. value
FL

NE Highway 314 (CR 314)(from NE 52nd Place Road to Northeast 170th Avenue Road)
Infrastructure
Post-Bid
$2,860,000 est. value
FL

SW Ridgewood Rd Resurfacing (SW Woodland Ave to NW 27th St)
Results
Less than $734,124 est. value
FL

Last Updated 03/29/2022 03:58 PM
Project Title

Quail Creek Road Improvement Project

Physical Address View project details and contacts
City, State (County) FL   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $160,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves reclaiming and resurfacing of approximately .71 miles of minor local road sections in the Quail Creek Subdivision. Reclaim and resurface work involves roadway prep, shoulder removal, minor clearing and grubbing, importing lime rock to re-establish 2% roadway slope, reclaiming and resurfacing, temporary striping, permanent thermoplastic striping, and stabilizing all areas disturbed during construction with sod.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents