Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

700 Blocks South 3rd Street and South 4th Street Reconstruction
Infrastructure
Bidding
$553,860 est. value
Clinton, IA 52732

700 Blocks South 3rd Street and South 4th Street Reconstruction
Infrastructure
Bidding
$553,860 est. value
Clinton, IA 52732

Microsurfacing
Infrastructure
Results
IA

Fog Seal
Infrastructure
Results
IA

700 blocks South 3rd Street and South 4th Street Reconstruction
Infrastructure
Bidding
Clinton, IA 52732

Asphalt Street Overlay
Infrastructure
Results
Clinton, IA

Microsurfacing
Infrastructure
Bidding
$160,657 est. value
Clinton, IA

Camanche 2021 Street Improvements Phase 3
Infrastructure
Results
Camanche, IA 52730

7th Avenue - PCC Pavement - New
Infrastructure
Bidding
Camanche, IA

Mill Creek Parkway Concrete Patching
Infrastructure
Results
Clinton, IA 52734

Z40 - HMA Resurfacing
Infrastructure
Bidding
IA

Fog Seal
Infrastructure
Results
IA

South 8th Street Sewer Separation
Infrastructure
Results
$1,014,200 est. value
Clinton, IA 52732

South 10th Street Sewer Separation
Infrastructure
Results
Clinton, IA 52732

Last Updated 03/16/2022 09:43 AM
Project Title

Concrete Street Rehabilitation - 14th Avenue North and 15th Avenue South Project

Physical Address View project details and contacts
City, State (County) Clinton, IA 52732   (Clinton County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $512,683
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves reconstruction of 14th Avenue North, between North 2nd Street and North 4th Street, excluding intersections of Pershing Boulevard and North 3rd Street, with 8” (eight inch) thick concrete paving on 12” (twelve inch) granular sub-base, with concrete curbs & gutters on each side. The project also involves concrete patching along 15th Avenue South from South 14th Street to 19th Place, with 7” (seven inch) concrete paving, with concrete curbs & gutters on each side.In addition to construction of Portland Cement Concrete streets, the project includes removal of existing concrete pavement, sub-grade preparation, granular road base construction, earth grading and removal, topsoil, sidewalk and driveway reconstruction, traffic control, erosion control, and other associated appurtenances to road rehabilitation and sewer infrastructure repair and construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents