Similar Projects
Fritz Avenue Subdivision
New Construction
Design
Quarryville, PA 17566

Fritz Avenue Subdivision
New Construction
Design
Quarryville, PA 17566

2022 Roadway Project Contract No. 1 - Bituminous Seal Coat
Infrastructure
Bidding
$110,000 to $160,000 est. value
Leola, PA

2022 Roadway Project - Contract 3 - Cold-In-Place Recycling
Infrastructure
Bidding
$675,000 to $775,000 est. value
Leola, PA

Seal Coat
Post-Bid
Lancaster, PA

Harrisburg Pike and State Road Improvements Project
Post-Bid
Lancaster, PA 17538

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Wearing Course Paving
Results
New Holland, PA 17557

Meadia Heights Golf Course Pool and Restaurant
New Construction, Renovation - 1,800 SF
Construction
Lampeter, PA 17537

Brent L Miller Jewelers
Infrastructure
Pending Verification
Lancaster, PA 17601

2022 Roadway Project Contract No. 2 - Paving
Infrastructure
Bidding
$140,000 to $190,000 est. value
Leola, PA 17540

Seal Coating, Paving
Post-Bid
Willow Street, PA

Golden Triangle Signal Upgrade/Lititz Pike Pedestrian Crossing Signal
Results
$700,000 est. value
Lancaster, PA 17601

2022 Paving
Infrastructure
Bidding
Lititz, PA

2021 Road Projects
Post-Bid
Denver, PA 17517

Last Updated 02/07/2022 11:13 AM
Project Title

2022 District Wide Paving and Flatwork Repairs

Physical Address View project details and contacts
City, State (County) Landisville, PA   (Lancaster County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Bids must cover all costs for the completion of this project as set forth in the Project Manual. The principal items of work to be performed under the contract are: 1) sealing and long-term preventative work at the Landisville Intermediate School; 2) sealing, long-term preventative work, and loading dock concrete and handrail replacement for the Farmdale Elementary School; 3) repaving the central drive and stairs/loading dock repairs at the Centerville Elementary School; 4) sidewalk replacement at the Landisville Campus Quad parking lot; 5) sidewalk replacement at the Landisville Middle School; 6) replacement of sidewalk, concrete steps, and handrails at the High School; and 7) repair of critical drainage inlets and surrounding paving at areas indicated within the Landisville Campus.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents