Similar Projects
Hydroelectric Controls Upgrade Project
Renovation
Bidding
$1,099,000 CJ est. value
Walla Walla, WA 99362

South Side Water System Improvements - Phase II and S. 5th Avenue Reconstruction
Infrastructure
Bidding
$980,000 CJ est. value
Connell, WA 99326

Courthouse Replumbing of Potable Water
Renovation
Sub-Bidding
$40,000 CJ est. value
Stevenson, WA 98648

AKPPC Plumbing Repair and Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Spokane, WA 99201

Custom PVC Elbow Traps - Value Blanket
Alteration
Post-Bid
Spokane, WA

Ductile Iron Pipe
Alteration
Post-Bid
Everett, WA

Mechanical and Plumbing On Call Portwide
Alteration
Results
$300,000 est. value
Seattle, WA

URGENT Residential Plumbing Repair
Alteration
Results
Spanaway, WA

Residential Plumbing South
Term Contract
Post-Bid
$4,000 est. value
WA

MHR - Urgent Residential Plumbing Repairs
Alteration
Results
$2,950 est. value
WA

Residential Plumbing North
Term Contract
Post-Bid
$7,500 est. value
WA

Weatherization Residential Insulation 8550
Alteration
Results
Eatonville, WA

Structural Leak Joint Sealant and Grouting Repairs Work Order
Alteration
Post-Bid
WA

Rainier Community Center ADA Barrier Removal
Term Contract
Results
$1,277,240 est. value
Seattle, WA 98118

Chief Joseph Dam Spillway Monolith Sealing, Bridgeport, Washington
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bridgeport, WA 98813

Last Updated 02/24/2023 07:07 PM
Project Title

Plumbing Repairs and Bathtub Replacement - Habitat for Humanity

Physical Address View project details and contacts
City, State (County) White Center, WA 98146   (King County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Owner To Subcontract, Bids by Invitation
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $10,000 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

Residential home in the White Center area needs new supply lines for the toilet in the master bathroom, current supply lines are incorrectly done. This project will also entail removing the existing bathtub in the main bath and replacing with a new lower walled (14") tub, replacing the surround, and installing new valves and fixtures.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents