Similar Projects
Earth City UPS Pump Station (P-702) Replacement Phase II
Infrastructure
Bidding
Earth City, MO 63044

Abandoned Well Plugging 2022
Infrastructure
Bidding
$200,000 est. value
Osage Beach, MO

Electrical Submersible Dewatering Pumps
Post-Bid
Saint Louis, MO

Highway Department Maintenance Facility - Phase 2
Post-Bid
Carthage, MO

Missouri Bluffs Park Well
Alteration
Results
Lake Saint Louis, MO 63367

Lime Slurry Pumps
Infrastructure
Results
Festus, MO

1/2 Hp Cast Iron Pump
Term Contract
Post-Bid
Saint Louis, MO

Plugging of Well 10, Well 11, and Voss Well
Infrastructure
Results
Sullivan, MO

Well Maintenance Contract Services
Term Contract, Infrastructure
Post-Bid
O Fallon, MO

JCHMF Phase 2 – Water Supply Well
Infrastructure
Results
Carthage, MO

Neptune-Abaque Peristaltic Industrial Hose Pump Unit Model HDN25
Infrastructure
Post-Bid
Springfield, MO

Submersible Pump and Motor for the WWTP East Well
Infrastructure
Results
Lebanon, MO

Replacing Ras Pumps, Control Panels, Check Valves, Piping and Motors
Alteration
Post-Bid
Fulton, MO

Design-Build Platform for Pump Disconnects
Infrastructure
Results
Saint Peters, MO

Saylor-Beall Air Pump Model 9000 with Installation
Infrastructure
Post-Bid
Springfield, MO

Last Updated 06/09/2022 02:57 AM
Project Title

Water Filtration Plant High Service Pump #3 Replacement and VFD Installation

Physical Address View project details and contacts
City, State (County) Sedalia, MO 65301   (Pettis County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Sedalia invites bids from vendors for replacement of a high service pump (#3) at the water filtration plant and installation of a variable frequency drive. The contractor shall be responsible for removal of existing, installation of new components including: start-up and testing.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents