Similar Projects
Last Updated 02/25/2021 08:25 AM
Project Title

District Wide Gymnasium HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Avenel, Colonia, Iselin, NJ 07001   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of this project includes, but is not limited to, the removal of the existing HVAC equipment and installation of new HVAC equipment and all associated components required for an HVAC upgrade, at the Avenel Middle School, Colonia Middle School, Fords Middle School, Iselin Middle School, Colonia High School, and JFK Memorial High School.

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals, Structural Steel Framing, Metal Fabrications, Metal Railings, Pipe and Tube Railings.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Thermal Insulation, Built-Up Bituminous Roofing, Built-Up Asphalt Roofing, Cold-Applied Built-Up Asphalt Roofing, Sheet Metal Flashing and Trim, Firestopping, Penetration Firestopping, Joint Sealants.
Division 08 - Openings.
Division 09 - Finishes, Painting, Exterior Painting.
Division 22 - Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, Refrigerant Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Air Outlets and Inlets, Diffusers, Registers, and Grilles, Packaged Compressor and Condenser Units, Central HVAC Equipment, Packaged Outdoor HVAC Equipment.
Division 26 - Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices.
Division 31 - Earthwork, Earth Moving, Excavation Support and Protection.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Fences and Gates, Chain Link Fences and Gates.
Division 33 - Utilities, Natural-Gas Distribution, Natural-Gas Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents