Similar Projects
API 653 External Tank Inspection
Bidding

API 653 External Tank Inspection
Bidding

Water Tank Recoating 2019
Post-Bid
Less than $150,000 est. value
Jacksonville, OH

Repair Culvert Valve Bulkhead
Post-Bid
Newport, OH 45768

0.5 MG Elevated Water Storage Tank
Results
$1,590,000 est. value
Tipp City, OH

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Northridge Water Tank Project
Bidding
Springfield, OH

Multistack Preventative Maintenance
Term Contract
Post-Bid
Columbus, OH 43207

Contract I: Procurement of two hundred (200) Grinder Pump Cores, Controls and Appurtenances
Results
Hillsboro, OH 45133

SR 45 Corridor Improvements Elevated Water Tank
Bidding
$16,155,000 est. value
Lordstown, OH

Replace Hydrant Fuel System at Wright-Patterson Air Force Base
Post-Bid
$10,000,000 to $25,000,000 est. value
Wright Patterson Air Force Base, OH 45433

H--Annual Water Tank Cleaning and Inspection | Base +4 OYs
Results
Chillicothe, OH

Contract A- North Baltimore Waterline Improvements and Contract B- 500000 Gallon Elevated Water Storage Tank
Bidding
$741,000 to $1,886,000 est. value
North Baltimore, OH

Elevated Storage Tank Improvements
Post-Bid
Less than $1,500,000 est. value
Archbold, OH

Supply and Installation of a 12,000 Gallon Horizontal, Doublewall Tank
Results
Circleville, OH 43113

Last Updated 03/10/2020 08:42 AM
Project Title

Mount Pleasant Water Storage Tank Recoating

Physical Address View project details and contacts
City, State (County) Mount Pleasant, OH 43939   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $254,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Recoating a double ellipsoidal 4-column elevated water storage tank including all mobilization, demobilization and site preparatory work, all equipment and materials required for removal and disposal of sludge from inside tank to an approved site, performing designated modifications and repairs, providing required containment system, preparing tank surfaces for recoating, dispose of cleaning materials (abrasives) and materials removed (coatings and rust) during surface preparation, recoating the tanks, disinfection of interior tank surfaces, and all other work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents