Similar Projects
Chenman - Phase II
New Construction, Infrastructure - 81,650 SF
Design
$16,000,000 CJ est. value
Norfolk, VA 23517

Apartments / Norfolk
New Construction, Infrastructure, Alteration
Design
$35,000,000 est. value
Norfolk, VA 23518

Frament Avenue Drainage Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Norfolk, VA 23502

Systemic Flashing Yellow Arrow Improvements Phase 2
Infrastructure
Bidding
$150,000 CJ est. value
Norfolk, VA 23510

River Star Homes- Residential BMP Construction
Post-Bid
Norfolk, VA

Governor's Quad Pavers
Post-Bid
Radford, VA 24141

Granby Street Bike Bypass at Riverview
Results
Norfolk, VA

Granby Street Bike Bypass at Riverview
Results
Norfolk, VA

Hurrah Players' Theater Addition - Hugh Copeland Center / Norfolk
Addition, Demolition, Renovation, Infrastructure
Design
$2,000,000 CJ est. value
Norfolk, VA 23510

Western Reservoir System Repairs
Infrastructure
Bidding
$500,000 CJ est. value
Norfolk, VA 23510

Colonial Road/ Virginia Beach Boulevard Intersection Improvements
Infrastructure
Post-Bid
Virginia Beach, VA

Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Results
Less than $75,000,000 est. value
Washington, DC

The Railyard at Lamberts Point
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Norfolk, VA 23508

RFP D/B - Design and Construction of East Bute Street Garage
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Norfolk, VA 23510

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Last Updated 09/21/2022 09:04 PM
Project Title

Pedestrian Accommodations and Countdown Signals Phase 2

Physical Address View project details and contacts
City, State (County) Norfolk, VA 23510   (Norfolk City County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project is a state and federally funded project through the HSIP Program. This project will upgrade outdated pedestrian signals to countdown signals to improve pedestrian comprehension and compliance. The project will also include upgrading push buttons, construction of ADA compliant ramps, and crosswalk installation. Twenty-five intersections throughout the city have been identified in this project. The DBE goal for this project is 1%. All Requests for Information (RFIs) shall be submitted no later than September 14, 2022 at 4:00 p.m. through the Questions portal at online. Any RFI submitted after this date cannot be guaranteed a response by the City. Work to be Substantially Completed in: 270 calendar days Liquidated Damages: Seven Hundred Fifty Dollars ($750.00) per day Performance Bond: one hundred percent (100%) Payment Bond: one hundred percent (100%) Bid Bond: five percent (5%) A Bid Bond, certified check, or cashier's check made payable to the Treasurer, City of Norfolk, for 5% of total bid must accompany each bid. Offerors shall upload a copy of the bid guarantee with the Offeror's acknowledgement to mail the original sealed document to the Owner, within two (2) business days. State Contractor registration class and number is required by electronic bidding via the Vendor Questionnaire. The City reserves the right to cancel the bid opening or to reject any or all bids in whole or part, when it is in the best interest of the City. The right to waive informalities and to determine responsiveness of any bid and responsibility of all bidders is reserved to the City. Withdrawal of bids will be in accordance with Section 33.1-42.1 of the Norfolk City Code and Section 11-54 of The Code of Virginia, 1950 (as amended).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents