Similar Projects
2023 Bond Projects - Empire Public Schools
Infrastructure, Renovation
Conception
$825,000 CJ est. value
Duncan, OK 73533

Utilities - US 81
Infrastructure
Design
$300,000 CJ est. value
Duncan, OK 73533

Grade, Drain, Bridge and Surface - SH 29
Infrastructure
Design
$23,599,437 CJ est. value
Bray, OK 73055

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Slabjacking and Subsealing Services
Infrastructure
Results

Bridge and Approaches County Road (NS-296)
New Construction, Infrastructure
Results
OK

Bridge and Approaches - SH 53
Infrastructure
Design
$3,563,195 CJ est. value
Duncan, OK 73533

Fy23 Asphalt Resurfacing Project
Alteration
Post-Bid
Marlow, OK

Bridge Water Proof Seal SH-7 Westbound/SH-53
New Construction, Infrastructure
Results

Intersect Modif - US 81
Infrastructure
Design
$646,300 CJ est. value
Duncan, OK 73533

Advanced Metering Infrastructure
Infrastructure
Post-Bid
$200,000 CJ est. value
Duncan, OK 73533

Resurface (Asphalt) SH-7
Infrastructure
Results

Comanche Public Schools - 2023 Bond - Independent School District 2
Build-out, Renovation, Infrastructure
Design
$3,950,000 CJ est. value
Comanche, OK 73529

New Wrestling Building
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Marlow, OK 73055

Last Updated 03/30/2023 12:34 AM
Project Title

Bridge and Approaches - SH 53

Physical Address View project details and contacts
City, State (County) Duncan, OK 73533   (Stephens County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $3,483,579 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh 53: Over 3 Unnamed Creeks 1.2, 1.1 & 0.8 Mis. W. Of Sh 89. As of March 30, 2023, the project is in Design status. Anticipated letting month/year is July, 2024. Length : 0.600 Mi. OKDOT - Bridge and Approaches - SH 53 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents