Similar Projects
Lazy Glen Wastewater Treatment Facility
Renovation
Bidding
CO

Sludge Drying Facility
New Construction
Bidding
New Castle, CO

Total Organic Carbon (TOC) Analyzer for Water Reclamation Facility
Post-Bid
Pueblo, CO

Sterling Wastewater System Improvements Bid Package 100 Headworks and Influent Pump Station
Post-Bid
$5,000,000 to $7,000,000 est. value
Sterling, CO

CMGC Chemical Phosphorus & UV Disinfection Project
Results
Englewood, CO 80110

2020 Trenchless Sewer Main Replacement
Results
Less than $1,164,404 est. value
Arvada, CO 80002

Construction Manager at Risk Wastewater Treatment Facility Improvements
Construction
Platteville, CO 80651

Construction of a New Purgatory Metro District Wastewater Treatment Plant
New Construction
Bidding
Durango, CO

Wastewater Treatment Plant Equipment
Post-Bid
Johnstown, CO

Non-Potable Water Reuse System
Results
Pueblo, CO 81007

Construction of Oak Meadows On-Site Wastewater Treatment and Restroom Renovation
Renovation
Bidding
Colorado Springs, CO 80921

Bid Package 300 Sterling Wastewater System Improvements
Post-Bid
$15,000,000 to $20,000,000 est. value
Sterling, CO 80751

WWSD 2020 Capital Improvement Project
Results
Less than $7,650,000 est. value
Monument, CO 80132

Farmers Korner Wastewater Treatment Facility Filter Media Replacement
Renovation
Bidding
Breckenridge, CO

Rifle Wastewater Reclamation Facility Dewatering Improvements
Post-Bid
Less than $744,000 est. value
Rifle, CO

Last Updated 10/22/2021 11:30 AM
Project Title

Wastewater Treatment Plant Improvements 2021 - Design

Physical Address View project details and contacts
City, State (County) Crested Butte, CO 81224   (Gunnison County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project engineering and design consists of three major infrastructure improvement components: 1) Secondary Treatment Process Building: Enclosed secondary treatment building to include HVAC system, a 50kW solar panel, odor control and emergency generator. Enclosure includes office space, bathrooms, breakout space/ lunch and workshop/ toolroom. Aeration tank improvements include centrate return improvements (flow meter and controls), and phosphorus treatment improvements to meet future effluent limits. Full plant upgrade of existing wastewater treatment plant water service. 2) Solids Process Building Equipment Replacement: including thickening equipment, polymer systems, sludge holding tank blower(s), sludge transfer pump(s) and boiler system. Solids process building equipment including electrical and control integration. 3) Compost Building Rehab: rehab of the interior steel building and new HVAC system.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents