Similar Projects
Deep Injection Wells No. 3 and No. 4 Pump Station
Infrastructure
Bidding
$83,400,000 est. value
Hollywood, FL 33019

Military Point Advanced Wastewater Treatment Facility Pumps and Motors Replacement Project
Alteration
Bidding
$500,000 est. value
Panama City, FL 32403

Electric Motor Repair
Post-Bid
Cape Coral, FL 33915

Annual Agreement For Wastewater Pump Station Repair And Renovation
Term Contract
Post-Bid
FL

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

New Well 16 Construction and Well 11 Abandonment
Results
Jacksonville Beach, FL 32227

Water Treatment Plant (WTP) and Drinking Water Pump Stations Pump Motors Replacement Project
Infrastructure
Bidding
Panama City, Southport, FL 32404

SHIP Program Well and Septic Installation
Post-Bid
Macclenny, FL 32063

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

Fire Department Deep Well Installation
Infrastructure
Bidding
Port Saint Joe, FL 32456

Well Pump Motor
Post-Bid
Plant City, FL 33564

Raw Water Well #9
Results
Hallandale, FL 33009

Submersible Pump Repair and Rehabilitation
Infrastructure
Bidding
Panama City, FL

Well Pump Diagnostic for Irrigation System NRCS FL
Post-Bid
Brooksville, FL 34601

Well 15 South Profile Well and Remediation Well R-4
Results
Hobe Sound, FL 33455

Last Updated 01/21/2022 01:57 PM
Project Title

Spruce Creek Preserve Water Plant Well Upgrade

Physical Address View project details and contacts
City, State (County) FL   (Marion County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $165,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To construct a new 12” Upper Floridan public supply well, hydropneumatic tank, and yard piping at the Spruce Creek Preserve Water Treatment Plant (WTP). include well construction with approximately 200 linear feet (LF) of 12” well casing, 270 LF of 12” open hole, plumbness and alignment testing, well development, drawdown testing, water quality testing, and submersible turbine well pump for a single 12” Upper Floridan public water supply well.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents