Similar Projects
Naptown Fitness Plus Retail Development
Renovation - 17,000 SF
Conception
Indianapolis, IN 46208

Affordable Housing Development
New Construction
Conception
$30,000,000 est. value
Indianapolis, IN 46205

Bid Package #2 - Additions and Renovations to Bibich Elementary - Building Package
Addition, Demolition, Renovation, Infrastructure
Design
$9,434,204 CJ est. value
Dyer, IN 46311

Bid Package #3 - Additions and Renovations to Bibich Elementary - Mechanical/Electrical Package
Addition, Demolition, Renovation, Infrastructure
Design
$3,238,550 CJ est. value
Dyer, IN 46311

Small Structure Pipe Lining
Infrastructure
Bidding
$1,386,823 CJ est. value
Indianapolis, IN 46208

Added Travel Lanes, Auxiliary Lane Construction
Infrastructure
Bidding
$2,163,000 CJ est. value
Bedford, IN 47421

Morgan County Justice Center Parking Lot
New Construction, Infrastructure - 100,000 SF
Sub-Bidding
$10,000,000 CJ est. value
Martinsville, IN 46151

Signing
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Bedford, IN 47421

IN000A IUPUI Campus-Repair Tunnel Top Under Ball Gardens
Post-Bid
Indianapolis, IN 46202

Asphalt Paving and Site Improvements
Post-Bid
Indianapolis, IN 46214

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Hampton Inn & Suites Hotel & Conference Center
New Construction - 71,987 SF
Construction
$13,000,000 est. value
Speedway, IN 46224

YMCA Expansion
Addition - 15,000 SF
Construction
$6,500,000 est. value
Crown Point, IN 46307

18th & Meridian Family Apartments
New Construction
Pending Verification
Indianapolis, IN 46202

Last Updated 08/18/2022 04:05 PM
Project Title

Southern Indiana Youth Sports Complex - County of Floyd

Physical Address View project details and contacts
City, State (County) New Albany, IN 47150   (Floyd County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Fitness Center, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not been identified. As of August 18, 2022, the Floyd County is in the process of obtaining state funding. Further details regarding design and construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Specialty Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents