Similar Projects
2021 Basin "B" Sanitary Sewer Relining Project
Bidding
$290,000 est. value
Montgomeryville, PA

Route 113 Video
Post-Bid
Skippack, PA

Central Drive Area Storm Sewer Video Inspection Project
Results
Less than $30,000 est. value
Lansdale, PA 19446

Old Reading Pike Force Main and Pump Station Upgrade Project
Results
Less than $235,000 est. value
Stowe, PA 19464

Hollow Road Sanitary Sewer Force Main Reconstruction
Results
Narberth, PA 19072

Woodland Drive Sanitary Sewer Replacement Project Phase 1
Results
Less than $350,000 est. value
Pottstown, PA 19464

Pennbrook Avenue Sanitary Sewer Rehabilitation
Results
Lansdale, PA 19446

Wagner/Cedar Sanitary Sewer Replacement
Results
Lafayette Hill, PA 19444

Sinkhole Remediation of Butler Pike
Results
Norristown, PA 19404

Swedesford and Britt Road Manhole E3428 Upgrades
Results
West Point, PA 19486

Fort Bevon Televising Project
Results
$50,000 est. value
Skippack, PA 19474

Fair Oaks Basin
Results
$500,000 to $600,000 est. value
Willow Grove, PA 19090

2020 Sanitary Sewer Lining, Storm Lining, And Manhole Reconstruction Pipe Lining
Results
$760,000 est. value
Ardmore, PA 19003

Sanitary Sewer Repair and Rehabilitation
Results
Horsham, PA 19044

Grosstown Road Sanitary Sewer Replacement Project
Results
Stowe, PA 19464

Last Updated 05/05/2021 09:49 AM
Project Title

Fort Bevon Road Sanitary Sewer Repairs

Physical Address View project details and contacts
City, State (County) Skippack, PA 19438   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Replace and install approximately 35 LF of “combined” sewer laterals from the sanitary sewer main to the WYE where the lateral splits to individual homes. Work consists of installing a new six inch (6”) sanitary sewer lateral connection at the sewer main including sawcut, excavation, removal of existing lateral, sidewalk, curb, and possible trees. Install of 6” SDR 26 PVC Pipe/Fittings, transition fittings, full stone backfill, temporary paving, and curb/sidewalk restoration. 2.(ADD-ON) – An add-on bid to provide individual costs per “combined” lateral in addition to the base bid of 43 laterals listed above. The number of additional laterals to be replaced will be at the sole discretion of the Township. The work required remains to replace and install approximately 35 LF of “combined” sewer laterals from the sanitary sewer main to the WYE where the lateral splits to individual homes. Work consists of installing a new six inch (6”) sanitary sewer lateral connection at the sewer main including sawcut, excavation, removal of existing lateral, sidewalk, curb, and possible trees. Install of 6” SDR 26 PVC Pipe/Fittings, transition fittings, full stone backfill, temporary paving, and curb/sidewalk restoration.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents