Similar Projects
Replacement Heaters at the Water Treatment Plant
Bidding
Harbor Beach, MI 48441

Replacement Boilers - Chippewa Hills School District
Bidding
Remus, MI 49340

Storm Water Mechanical and Electrical Systems Replacement Project
Post-Bid
Harrison Township, MI 48045

Construction Work for an Energy Performance Contract for Electric/Plumbing/ Mechanical/Build/Appliances
Post-Bid
Saint Joseph, MI 49085

Boiler Replacement for Columbiaville Elementary
Results
Less than $173,250 est. value
Columbiaville, MI 48463

Boiler Controls Upgrade
Results
Dollar Bay, MI 499220350

Boiler Replacements
Bidding
Munising, MI

Mechanical Improvement Projects Services
Post-Bid
Grand Rapids, MI

East McNair Steam Trap Replacement
Results
Less than $185,849 est. value
Houghton, MI 49931

Pump Station Maintenance Program
Bidding
Southfield, MI

Boiler Pre-Pricing Package
Post-Bid
Walled Lake, MI

DNR Escanaba Field Office Boiler Replacement
Results
Less than $83,955 est. value
Gladstone, MI

2021 Mechanical System Improvements
Bidding
Coopersville, MI

Stevenson High School Mechanical Upgrades
Post-Bid
Sterling Heights, MI

Installation of Boiler
Results
East Tawas, MI 497309506

Last Updated 11/12/2019 09:54 AM
Project Title

Replace Bldg. 570 Boiler "Mulligans"

Physical Address View project details and contacts
City, State (County) Harrison Township, MI 48045   (Macomb County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall schedule and perform a construction task for the replacement of the existing Building 570 Clubhouse heating boiler system. The Contractor will provide a complete and operable boiler system at building 570. The boiler shall be high efficiency condensing boiler. The design basis for this boiler shall be a Lochinvar Series KBN or equivalent in line with The Selfridge ANG Base Design Standards. The installation and replacement shall include but is not limited to all piping connections, venting, power connections, boiler pumps, hot water pumps, and system start-up and validation.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans