Similar Projects
U-Haul - King Street / Charleston
New Construction, Renovation, Infrastructure - 171,392 SF
Conception
$12,000,000 CJ est. value
Charleston, SC 29403

Stono Shores Subdivision
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Charleston, SC 29412

Thompson Hotel - Montford Building
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Charleston, SC 29403

Huger Street Hotel
New Construction, Infrastructure
Design
$37,000,000 CJ est. value
Charleston, SC 29403

Christian Brothers Automotive / Charleston
New Construction, Infrastructure - 5,343 SF
Bidding
$1,400,000 CJ est. value
Charleston, SC 29412

RFQ D/B - VA Charleston Additional Parking
New Construction, Infrastructure - 316,000 SF
Bidding
$30,000,000 CJ est. value
Charleston, SC 29401

FLETC Training Venue Replication
New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
North Charleston, SC 29405

207 Calhoun Street
Addition, Renovation, Infrastructure
Post-Bid
$1,400,000 CJ est. value
Charleston, SC 29424

Construction of Azalea Fuel Facility
New Construction, Infrastructure
Results
$13,906,000 CJ est. value
North Charleston, SC 29405

Install Duplex Grinder Pump Station
New Construction
Results
Hollywood, SC

Spinx #368 / Charleston
New Construction, Infrastructure - 4,000 SF
Construction
$3,000,000 CJ est. value
Charleston, SC 29401

Bees Ferry Road Retail Plaza
New Construction, Infrastructure
Construction
$2,000,000 CJ est. value
Charleston, SC 29414

St. Andrews Mixed Use Development
New Construction, Infrastructure - 11,400 SF
Pending Verification
$25,000,000 CJ est. value
Charleston, SC 29407

Cumberland Residential - The Clarke
Demolition, New Construction, Infrastructure - 3,000 SF
Pending Verification
$10,000,000 CJ est. value
Charleston, SC 29401

New District 20 Middle School - Charleston County School District
New Construction, Infrastructure
Conception
$22,000,000 CJ est. value
Charleston, SC 29403

Last Updated 01/24/2023 10:34 AM
Project Title

Wild Dunes Pump Station

Physical Address View project details and contacts
City, State (County) Dewees Island, SC 29451   (Charleston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction Commenced, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of January 10, 2023, notice to proceed has been issued and construction is underway. Construction of this project is expected to take 6 months to be completed. No further inquiries to be accepted. The project consists of the following generally described work: The construction of a triplex pump station, wet well, roughly 105 feet of yard piping, odor control system, electronics containment building, and all other related valves and appurtenances to complete the pump station and conveyance system. The pump station will need to have an output capability of 1,743 GPM at 58.2 feet of head, and the wet well will be approximately 16 feet deep Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in South Carolina with an "A" minimum rating of performance and a financial strength of at least five times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability." Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes it w ould not be in the best interest of the Project to make an award to Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owne Only pre-qualified contractors may bid on this project. A list of pre-qualified contractors will be made available upon request to the Owner. *This project has been awarded and all trades have been let.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents