Similar Projects
Improve Safety on Us-119 Through the Gateway Industrial Park to Us-23, Including Us-23 Flyover Ramp
Infrastructure
Conception
$18,340,000 CJ est. value
Whitesburg, KY 41858

Improve Us-119 From North of Ky-15 to Brass Drive (South)
Infrastructure
Conception
$10,060,000 CJ est. value
Whitesburg, KY 41858

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt Resurfacing - Shelby Gap Road
Infrastructure
Post-Bid
$933,177 CJ est. value
Thornton, KY 41855

Waterline Improvement Project Phase 1
Infrastructure
Post-Bid
$900,000 est. value
Fleming-Neon, KY

World-Wide Water Storage Tank Remediation
Term Contract
Results

Mike Baker High Priority AML project
Infrastructure
Results
$27,983 CJ est. value
Whitesburg, KY 41858

Water Line Replacement and Water Tank Project - Contracts 1, 2, and 3
Infrastructure
Post-Bid
$300,000 CJ est. value
Whitesburg, KY 41858

Asphalt Resurfacing - Jenkins - Shelby Gap Road (KY 805)
Infrastructure
Post-Bid
$958,365 CJ est. value
Jenkins, KY 41537

Disaster Repairs
Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Fleming, KY 41840

Disaster Repairs
Renovation, Infrastructure
Post-Bid
$600,000 CJ est. value
Jenkins, KY 41537

Disaster Repairs
Renovation, Infrastructure
Post-Bid
$350,000 CJ est. value
Jenkins, KY 41537

Asphalt Paving Contractor
Infrastructure
Post-Bid
$300,000 CJ est. value
Jenkins, KY 41537

Sports Field Services for Earnest Cook Park
Infrastructure
Post-Bid
$1,100,000 CJ est. value
Whitesburg, KY 41858

Road Repairs Using Rail and Cribbing Methods.
Infrastructure
Post-Bid
$300,000 CJ est. value
Whitesburg, KY 41858

Last Updated 12/06/2022 04:32 PM
Project Title

Waterline Improvement Project Phase 2 - Contract 1 Waterline

Physical Address View project details and contacts
City, State (County) Fleming, KY 41840   (Letcher County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

City of Fleming Neon Separate sealed bids for the Waterline Improvement Project Phase 2, Contract 1 Waterlines and Contract 2 Water Storage Tank for the City of Fleming Neon. The Information for Bidders, Form of Bid, Form of Contract, Plans, Specifications and Forms of Bid Bond, Performance and Payment Bond, and other contract documents may be examined at Fleming Neon City Hall 955 HWY 317 Neon, KY 41840. No pre-bid conference will be held. Questions should be addressed in writing to Matt Steen, Nesbitt Engineering Inc., msteen@nei-ky.com. before November 29, 2022 at 5:00 pm EST. The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit his bid security in the amount, form and subject to the conditions provided in the Information for Bidders. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract. These include Section 3, Segregated Facility, Section 109 and E.O. 11246. Further, Title VI Minority bidders are encouraged to bid. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Completion Date: Bidder must agree to commence work on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete- the project within 180 consecutive calendar days thereafter. Bidder must agree also to pay as liquidated damages, the sum of $ 750 for each consecutive calendar day thereafter as hereinafter provided in the General Conditions.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents