Similar Projects
Z--INDE 236306-Replace Chiller Plants/Cooling Towers
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19106

Major HVAC Renovation at Franklin S Edmonds School - General
Alteration
Bidding
$482,395 est. value
Philadelphia, PA 19150

Philadelphia Pa Cetc Hvac Upgrades
Alteration
Bidding
Philadelphia, PA 19104

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

Bally Walk-In Freezer
Post-Bid
Philadelphia, PA

Air Conditioner 10,000 Btu 120 V R410a
Results
Less than $25,000 est. value
Philadelphia, PA

General HVAC Services (Maintenance and Repair)
Results
Philadelphia, PA 19102

ATC/HVAC Services - DVVH
Alteration
Bidding
Philadelphia, PA 19154

Compressor (New) Cummins 5286681 Air
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA

Fume Hood Filters
Results
Philadelphia, PA

Duct Work
Post-Bid
Philadelphia, PA

Pleated Air Filter
Results
Less than $25,000 est. value
Philadelphia, PA

Overload Westcode Wd35140-003 SLV HVAC
Post-Bid
Philadelphia, PA

Hose NF 6356857 Air Compressor
Results
Less than $25,000 est. value
Philadelphia, PA

Radiator Covers
Post-Bid
$25,000 to $100,000 est. value
Philadelphia, PA

Last Updated 07/07/2021 12:32 PM
Project Title

Air Handling Unit Refurbishments

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19130   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provides for HVAC support of the Bonnell, Mint and West Buildings via sixteen (16) existing indoor Air Handling Units and three (3) HV units located in the basements of the Bonnell Building (Quantity -8), Mint Building (Quantity -4) and West Building (Quantity-4). The TRANE units are of various sizes ranging from approximately 27,000 CFM to 45,000 CFM and include the original sixteen (16) heating coils. All of the units are of the same vintage, were installed and have been operational since 1980. Based on the physical appearance it seems that the none of the units’ critical components, such as the dampers and coils have ever been replaced. Currently, an operational need exists to replace the cooling and heating coils; clean the unit interiors free of dust, rust and debris; replace the automated dampers and unit access doors; and the provide ultra-violet light sterilization for potential airborne viruses and bacteria. The successful completion of this project will achieve improved the air quality of CCP’s facilities and increased efficiency of the HVAC system. The project shall be phased over a sixty (60) day construction period such that at least two units in either building remain operational throughout the construction period.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents