Similar Projects
Jackson Creek Road Improvements
Term Contract
Design

Madison Arm Road Improvements
Infrastructure
Bidding
$250,000 to $500,000 est. value
West Yellowstone, MT 59758

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Chip Seal E Frontage Road SE Of Dutton Airport Great Falls Area
Infrastructure
Post-Bid
Belgrade, MT 59714

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Seal and Cover, Guardrail, Pavement Markings on the Three Forks
Infrastructure
Post-Bid
MT

Hudson Bay Divide South
Infrastructure
Results

Scrub Seal VC Hill Bozeman Area
Alteration
Post-Bid
Bozeman, MT

Overlay and Chip Seal Madison Frontage Road and Two Dog Road Bozeman Area
Infrastructure
Results
Silver Star, MT 59751

Scrub Seal Big Sky South Bozeman Area
Alteration
Post-Bid
Bozeman, MT

Overlay and Chip Seal Frontage Rd W of Columbus Billings Area
Infrastructure
Results

Overlay and Chip Seal Lodgepole Road Kalispell Area
Alteration
Post-Bid

Scrub Seal Hwy 10 E Se of Greycliff Interchange Billings Area
Infrastructure
Results

Chip Seal Dry Creek Rd Belgrade and Dry Creek Rd Manhattan Bozeman Area
Infrastructure
Results
Belgrade, MT 59714

Last Updated 06/23/2022 05:35 AM
Project Title

GAOA Jackson Creek Road Improvements

Physical Address View project details and contacts
City, State (County) Bozeman, MT   (Gallatin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To prepare the road surface (by grading, watering, and rolling) and install commercial source aggregate surfacing along with drainage structures and turnouts on Jackson Creek Road #977 on the Bozeman Ranger District, Custer Gallatin National Forest. Work includes furnishing all labor, equipment, supervision, transportation, operating supplies, and incidentals necessary to perform road work on the road specified herein. All work and equipment shall be in compliance with the terms, specifications, and provisions of this contract. All equipment shall be in good operating condition and shall be operated by competent, experienced operators experienced in the work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents