Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Repairs to Campus Lighting at Coral Shores High School
Alteration
Bidding
$35,000 est. value
Tavernier, FL 33070

KLWTD Vacuum Stations Modifications
Alteration
Bidding
Key Largo, FL 33037

Specifications for Transmission and Distribution Crews During Emergency Situations
Term Contract
Post-Bid
Key West, FL

Engineer And Replace Overhead Shield Wire With Optical Ground Wire
Renovation
Post-Bid
Tavernier, FL

Transmission Pole Top Repairs
Results
Key West, FL 33041

Specifications for Purchase of Padmount Transformers
Results
Key West, FL 33041

Specifications for Marathon "N" Feeder Upgrade
Term Contract
Construction
Marathon, FL 33050

Specifications for Certified Substation Electrician Rates
Term Contract
Bidding
Key West, FL

Specifications for Purchase of Transformers
Post-Bid
Key West, FL

Emergency Portable Generators
Term Contract
Results

Purchase of Transformers
Term Contract
Bidding
Key West, FL

Engineer and Replace Overhead Neutral Wire With Optical Ground Wire
Renovation
Post-Bid
Tavernier, FL

Stock Island Generating Transformers and Breakers
Results
Stock Island, FL

Specifications for Meter Exchange for AMI Project
Term Contract
Bidding
Key West, FL

Last Updated 05/02/2022 05:20 PM
Project Title

Transformer Repair, Hot Oil Processing and Electrical Testing

Physical Address View project details and contacts
City, State (County) Key West, FL   (Monroe County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Conducting maintenance on a transformer in KEYS’ system that has been found to be leaking oil from the radiator butterfly valves. The required maintenance includes repairing/replacing the radiator valves and re-gasketing, if necessary. After fixing the leak, the transformer is to have Hot Oil Processing performed in the main tank and LTC. Oils that test for low levels of inhibitor will require additional inhibitor to be added to accomplish satisfactory levels. The chosen vendor will then conduct the required electrical testing listed in the subsequent section.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents