Similar Projects
Union Street Dam Improvements - 168-19-CIP - City of Traverse City
Renovation, Infrastructure
Conception
$19,600,000 CJ est. value
Traverse City, MI 49684

Eighth Street- Lake Avenue to Woodmere - 882-18-CIP - City Of Traverse City
Infrastructure
Conception
$10,550,000 CJ est. value
Traverse City, MI 49684

3566 North US 31 Multi Tenant
New Construction, Infrastructure - 6,800 SF
Design
$2,000,000 CJ est. value
Traverse City, MI 49684

Fairfield Hotel
New Construction, Infrastructure - 53,124 SF
Design
$14,000,000 CJ est. value
Traverse City, MI 49684

2023 Madison Jefferson Reconstruction Project
Infrastructure
Bidding
$50,000 CJ est. value
Traverse City, MI 49684

2023 Madison Jefferson Reconstruction Project
Infrastructure
Bidding
$50,000 CJ est. value
Traverse City, MI 49684

Keystone/River Road Roundabout Construction
Alteration
Post-Bid
Traverse City, MI

Obstruction Removal - Phase 2 (RVZ)
Infrastructure, Alteration
Post-Bid
Traverse City, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Springbrook Sad
Infrastructure
Results
Traverse City, MI

Hammond Road Apartments
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Traverse City, MI 49686

New Headquarters and Operations Center - Bay Area Transportation Authority
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Traverse City, MI 49684

Toms/Kmart Redevelopment
New Construction, Renovation, Infrastructure
Design
$10,000,000 CJ est. value
Williamsburg, MI 49690

North Cass Street and South Union Street Bridges Project Professional Services for Construction Administration Using MDOT Field Manager
Infrastructure
Bidding
$400,000 CJ est. value
Traverse City, MI 49684

HMA for Pothole and Wedging
Infrastructure
Post-Bid
Traverse City, MI

Last Updated 12/30/2022 02:34 PM
Project Title

Obstruction Removal (RVZ) - Phase 3

Physical Address View project details and contacts
City, State (County) Traverse City, MI 49686   (Grand Traverse County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $709,981 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Obstruction Removal (RVZ) - Phase 3. The project consists of furnishing all material and constructing the following: The demolition of pavements, utility infrastructure, concrete blast wall, and the construction of apron pavements, storm water system, and perimeter fencing. The deadline for questions is 5:00PM (EST) on Friday, November 11, 2022. The Bidder is to complete the Bid Proposal documents that are included in the Project Specification book (online or hard copy), referring to the table of contents to identify the exact order of these documents. Regardless of how the bid documents are received, a hard copy (paper copy) of the Bid Proposal Documents must be submitted for bidding purposes. No electronically submitted Proposals will be accepted. The Bid Proposal Documents include all the items identified on the Bid Proposal Checklist. The Bidder must provide the signed Bid Proposal Documents in either type written or hand written (in ink) form and clearly and completely set forth all required lump sum amounts, unit prices or other costs in a legible and understandable manner. Illegibility of any work or figure in the proposal may be sufficient cause for rejection of the proposal by the Owners. No electronically submitted Proposals will be accepted. Any conclusions or information obtained or derived from Contract Documents will be at the user's sole risk. Prein&Newhof will maintain in its Grand Rapids office the master copy (hard copy) of the Contract Documents from which all electronic copies are based. In the case of any contract discrepancy, the Master Copy (hard copy) shall be considered the controlling document. The project will be financed by general airport revenues and are immediately available. However, future reimbursement of this work will be sought from the FAA and MDOT under a future grant, therefore all Federal Contract Provisions apply. A bid bond, certified check, or cashier's check payable Northwest Regional Airport Authority in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of ninety (90) days after the receipt of bids The DBE goal is 4% for this contract. The project shall be completed within seventy-four (74) days from date of Notice to Proceed. The Owner reserves the right to reject any or all bids and to waive any irregularities in bidding. No bid may be withdrawn after the scheduled closing time for receiving bids for at least ninety (90) days thereafter.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents