Similar Projects
Water Filtration System
Renovation
Bidding
$600,000 CJ est. value
Woodburn, OR 97071

Edison Avenue Pedestrian Improvements
Infrastructure
Bidding
$610,000 CJ est. value
Bandon, OR 97411

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

CB2 at Brewery Blocks 2 Building
Alteration
Post-Bid
Portland, OR

Diamond Lake Rescue Building
New Construction, Alteration
Results
Roseburg, OR

Commercial Plumbing Service
Alteration
Results
OR

On-Call Trade Services for Prevailing Wage Projects
Term Contract
Post-Bid
OR

Tri-City Water Resource Recovery Facility ("WRRF") Fill Removal
Infrastructure
Results
$662,500 CJ est. value
Oregon City, OR 97045

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Philomath Water Treatment Plant Improvements, Phase I
Infrastructure
Results
$4,161,000 CJ est. value
Philomath, OR 97370

Plumbing Supplies - EOCI
Term Contract
Post-Bid
Umatilla, OR 97882

Water System Improvements - Phase II - Collector Well No. 3 Pump Station, Booster Pump Station and 1 Million Gallon Reservoir
Infrastructure
Results
$10,207,115 CJ est. value
Boardman, OR 97818

Two Rivers Correctional Institution (TRCI) EVAC System Part Upgrade
Term Contract
Post-Bid
Umatilla, OR 97882

Wastewater Treatment Plant Improvements
Infrastructure
Results
$5,250,000 CJ est. value
Falls City, OR 97344

Plumbing Services
Term Contract
Post-Bid
Salem, OR 97301

Last Updated 07/03/2023 06:02 PM
Project Title

Fords Pond Community Park & Trail Improvements - Phase II

Physical Address View project details and contacts
City, State (County) Sutherlin, OR 97479   (Douglas County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,884,038 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing labor, materials, equipment and the following major items of construction: Construct a new playground and park with all of the associated grading, site work, equipment, landscaping and finishing. Construct a new overflow parking area and associated curbs, gutters, stormwater drainage, landscaping and other ancillary requirements. Construct a new paved trail around Ford's Pond that connects to the existing path and completes the perimeter loop; includes all grading, path material, interpretive areas, and misc. equipment. Perform wetland mitigation activities that involve removing a portion of 'islands' within Ford's Pond and depositing the spoils in a designated area. Install items that have been purchased and procured by the City. A Bid Security executed in favor of the Owner in the amount of not less than 10% of the total amount of the Bid is required. The Owner reserves the right to reject any or all Bids, to waive all informalities, and to accept such Bids that in the opinion of the Owner are in the best interest of the Owner.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents