Similar Projects
Dell Range/Rue Terre Intersection - EN-14-008 - City of Cheyenne
Infrastructure
Conception
$4,000,000 CJ est. value
Cheyenne, WY 82009

Dell Range/Rue Terre Intersection - EN-14-008 - City of Cheyenne
Infrastructure
Conception
$4,000,000 CJ est. value
Cheyenne, WY 82009

RFP D/B - Repair Base Perimeter Fence
Infrastructure
Design
$500,000 CJ est. value
Cheyenne, WY 82001

Pine Bluffs to Nebraska East / US 30
Infrastructure
Design
$2,206,000 CJ est. value
Cheyenne, WY 82007

North City Improvements - North City Tank
Infrastructure
Bidding
$2,500,000 CJ est. value
Cheyenne, WY 82001

Sanitation Division Transfer Station Welding Repairs
Infrastructure
Bidding
$100,000 CJ est. value
Cheyenne, WY 82007

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Crack Sealing and Miscellaneous Work
Infrastructure
Post-Bid

Cheyenne Streets - Warren Ave (Lincolnway - 24th)
Infrastructure
Results
Cheyenne, WY

District 1 Crack Seal
Infrastructure
Results

Storey Boulevard and Ridge Road Signalized Intersection
Infrastructure
Construction
$480,000 CJ est. value
Cheyenne, WY 82001

Hyatt Place Hotel and Cheyenne Center
New Construction, Infrastructure - 70,000 SF
Pending Verification
$55,000,000 CJ est. value
Cheyenne, WY 82007

Hyatt Place Hotel and Cheyenne Center
New Construction, Infrastructure - 70,000 SF
Pending Verification
$55,000,000 CJ est. value
Cheyenne, WY 82007

RFQ Engineering - Professional Engineer Services for Phase 1 Environmental Site Assessments
Infrastructure
Conception
$300,000 CJ est. value
Cheyenne, WY 82001

Cheyenne to Chugwater I-25 / US 85 Interchange / Accel Ramp
Infrastructure
Design
$1,000,000 CJ est. value
Ranchettes, WY 82009

Last Updated 01/27/2023 07:37 AM
Project Title

Downtown Connector Greenway - GR-21-008 - City Of Cheyenne

Physical Address View project details and contacts
City, State (County) Cheyenne, WY 82001   (Laramie County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Dey Avenue Connector will stop at the Pumphouse Wetlands. Final improvements need to be completed to the Pumphouse Wetlands to open this site to the public. Land will need to purchased east of the Pumphouse Wetlands to gain access to future grade crossing of BNSF railroad spur on Lincolnway, and then easements will be necessary to the east. Striping will occur along W. 15th St. for a shared vehicle/bicycle road to the Depot Plaza. Finally, negotiations will be needed with the railroad for a bike path under the Centeral Ave. and Warren Ave. viaduct, and then rehab of pavement along E. 15th St. to include a bike lane. As of January 27, 2023, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents