Similar Projects
Dooley Court
Bidding
$1,097,130 est. value
Salt Lake City, UT 84102

On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

2018 West Jordan Manhole Raising Project
Results
$161,900 est. value
West Jordan, UT

18K: Printers Row Waterline Replacement
Results
West Valley City, UT

1800 North Sewer Realignment
Post-Bid
Salt Lake City, UT 84116

2019 State Street Waterline Replacement
Results
Less than $1,200,000 est. value
Murray, UT 84107

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

104th and Bangerter Relocation
Term Contract
Results
Less than $1,300,000 est. value
Bluffdale, UT 84065

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

Installation and Repair of Sanitary Sewer Facilities
Results
Less than $125,000 est. value
Salt Lake City, UT

Manhole Lids, Rings, Monuments and Related Items
Term Contract
Post-Bid
Salt Lake City, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Cougar Lane Outfall 2A Sewer Relief Project
Post-Bid
Kearns, UT 84118

2018/2019 Various CIPP and Point Repair, Phase 1
Results
Less than $1,000,000 est. value
Salt Lake City, UT

Last Updated 01/23/2020 05:23 PM
Project Title

Chavez Drive Pipe Lining Project

Physical Address View project details and contacts
City, State (County) South Jordan, UT 84095   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $30,000 to $40,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed for this schedule is located on Chavez Drive from 1214 West to 1144 West and generally includes the UV CURE CIPP SPEC lining of the existing 15-inch RCP pipe on the north edge of the roadway. Connecting from junction box to junction box approximately 600 linear feet in length with one junction box mid-stream at approximately 300 feet. Pipe lining includes but is not limited to mobilization, staging, site prep, demolition or reconstruction if needed, all Labor, Supplies, Tools, Equipment, Parts, Rentals, Fuels, Utilities, Subcontractors, Suppliers, Traffic Control and all other Costs including Overhead and Profit. The Work to be performed for this schedule is located on Chavez Drive from 1214 West to 1144 West and generally includes the GEOPOLYMER SPRAY SPEC lining of the existing 15-inch RCP pipe on the north edge of the roadway. Connecting from junction box to junction box approximately 600 linear feet in length with one junction box mid-stream at approximately 300 feet. Pipe lining includes but is not limited to mobilization, staging, site prep, demolition or reconstruction if needed, all Labor, Supplies, Tools, Equipment, Parts, Rentals, Fuels, Utilities, Subcontractors, Suppliers, Traffic Control and all other Costs including Overhead and Profit

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents