Similar Projects
Poe Lock Rehibition Ship Arrestors Sault Ste Marie, MI
Renovation
Design
$10,000,000 to $25,000,000 est. value
Sault Sainte Marie, MI

Milham Park Dam Removal
Bidding
Kalamazoo, MI

MacArthur Lock Tainter Valve Machinery Replacement
Post-Bid
$5,000,000 to $10,000,000 est. value
Sault Sainte Marie, MI 49783

Sault Visitor Center Lock Operator Exhibit
Post-Bid
Sault Sainte Marie, MI

Ford Fieldhouse Tunnel Repairs
Results
Grand Rapids, MI

Korpela to Wakefield Stateline Grade Extension Culvert and Bridge Replacement
Results
MI

Gull Lake Dam Improvements
Renovation
Post-Bid
Grand Rapids, MI

Union Street Dam Fish Pass
Results
Traverse City, MI 49684

Flat Rock Dam Boom Installation
Post-Bid
Brighton, MI

2020 Chappel Dam Improvements
Results
Gladwin, MI 48624

Upstream Approach Wall Construction for the Soo Lock Complex, Sault Ste. Marie, MI.
Post-Bid
$100,000,000 to $250,000,000 est. value
Sault Sainte Marie, MI

Eden Dam Modifications and Stabilization Measures
Results
MI

New Lock at the Soo Chamber Construction
Post-Bid
$500,000,000 to $800,000,000 est. value
Sault Sainte Marie, MI 49783

Project Labor Agreement for Construction of New Soo Lock Chamber
Post-Bid
$500,000,000 est. value
Sault Sainte Marie, MI 49783

High Temperature Hot Water Replacement to Hill House
Post-Bid
Rochester, MI 48316

Last Updated 01/21/2021 08:35 AM
Project Title

Perrin Dam Improvements

Physical Address View project details and contacts
City, State (County) Marshall, MI   (Calhoun County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project work consists of clearing and grubbing the dam crest and upstream and downstream embankment slopes, placement of embankment fill on the upstream and downstream slopes, installation of a geomembrane liner on the upstream slope, placement of heavy riprap on the upstream slope, installation of a toe drain system with manholes at the downstream toe of slope, cast-in-place concrete abutment wall extensions, installation of geogrid and welded wire forms near the abutment walls, concrete repair of spillway walls and other work as shown on the plans and described in the specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents