Similar Projects
Repair Slumps on Hurricane Ridge and Obstruction Point Road
Alteration
Design
Port Angeles, WA

Z--Rehabilitate Parking Area, Ruby Beach
Term Contract, Infrastructure, Alteration
Design
$500,000 to $1,000,000 est. value
Port Angeles, WA 98362

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$165,000,000 to $180,000,000 est. value
WA

Rehabilitate Seawall
Alteration
Bidding
$500,000 to $1,000,000 est. value
Grand Coulee, WA 99133

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Geosynthetic and Erosion Control
Infrastructure
Post-Bid
WA

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

Jan Road Levee Setback Construction
Alteration
Design
$9,000,000 est. value
WA

Chumstick Creek Motteler Drive Culvert Replacement
Infrastructure
Bidding
$320,000 to $354,000 est. value
Leavenworth, WA 98826

Fakkema Access Road
Infrastructure
Post-Bid
$650,000 to $850,000 est. value
Oak Harbor, WA 98277

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Fall City Floodplain Restoration Planting
Alteration
Design
$1,000,000 est. value
WA

2022-2 SWM Culvert Replacement
Infrastructure
Bidding
$517,815 est. value
Snohomish, WA

Small Works Roster - Avenue NE Storm Repair - Phase One
Infrastructure
Post-Bid
Arlington, WA 98223

Reported 03/23/2022 12:00 AM
Project Title

Mount St. Helens Spirit Lake Intake Headwall

Physical Address View project details and contacts
City, State (County) Cougar, WA 98616   (Skamania County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $20,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Searching for Heavy and Civil Engineering Construction Contractors who can provide construction services for Mount St. Helens Spirit Lake Intake Headwall: - A 3 mile temporary access road including cut and fill road design. - A lake-side barge loading facility consisting of an earthen ramp, and a staging area - Mechanical Dredging from barges or floating work platforms - Construction of and working behind a cofferdam - Replacement of inlet gate, design of slide gate, hydraulic steel structures - Concrete repair to Headwall

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents