Similar Projects
Last Updated | 04/25/2023 12:18 PM |
Project Title | Gregson Interchange - Nissler Interchange |
Physical Address | View project details and contacts |
City, State (County) | Billings, MT 59106 (Yellowstone County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $13,170,595 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of April 25 the project was awarded to JEFFERY CONTRACTING LLC for $13,170,594.81. NHFP 90-4(82)211 - Pavement Preservation project to mill and fill full width the I-90 eastbound and westbound lanes, interchange ramps, crossroads at the Gregson Interchange, Ramsay Interchange and Nissler Junction to a depth of 0.20ft. and replaced with 0.20 ft. plant mix surfacing. This project will also include a seal and cover, bridge work, MASH compliant guardrail, rumble strips, new cattleguards, pavement markings and updated signing. The project is located 4.2 miles west of Butte on I-90. The project begins west of the Fairmont Interchange (RP 211.1) and proceeds 8.5 miles east to the Nissler Interchange (219.2). HSIP STWD (657) - Nissler Interchange - NB to WB loop ramp (121.6 to 121.95): replace existing speed advisory sign with solar powered radar speed feedback sign, install linear delineation on barrier in curve. WB to SB ramp: install chevrons and shoulder rumble strips through curve. This project is under the jurisdiction of the Butte District Administrator. Uniform No. 9465000, 9465000 MTDOT - 101 - Gregson Interchange - Nissler Interchange |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |