Similar Projects
Asphaltic Concrete Material
Term Contract
Sub-Bidding
Great Falls, MT 59401

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

RFQ - Precast Concrete
Term Contract
Post-Bid
MT

Bonner Mill Concrete Demolition and Backfill
Alteration
Results
$350,000 est. value
MT

Havre Public School Track Resurfacing Project
Infrastructure
Results
$389,135 CJ est. value
Havre, MT 59501

Reinforced Concrete Precast Box Culvert
Renovation, Infrastructure
Construction
$170,153 CJ est. value
Helena, MT 59601

Pavement Maintenance Project for the Polson Airport
Infrastructure
Post-Bid
$175,000 CJ est. value
Polson, MT 59860

Fort Benton Water Tank Replacement
New Construction, Infrastructure
Results
$3,743,275 CJ est. value
Fort Benton, MT 59442

Pompey Pillar National Monument Rock Stabilization
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Pompeys Pillar, MT 59064

Cottonwood Road (Oak to Baxter)
Infrastructure
Results
$9,569,369 CJ est. value
Bozeman, MT 59718

RFQ CM/GC - West End Reservoir Project
Infrastructure, Renovation
Post-Bid
$40,000,000 CJ est. value
Billings, MT 59101

2023 Bozeman Landfill LFG and Leachate/Condensate System Improvements Rebid
Infrastructure
Results
$274,340 CJ est. value
Bozeman, MT 59715

3/4" Minus Crush Gravel, and 3/8 " Seal Coat Aggregate
Term Contract
Post-Bid
Kalispell, MT 59903

2023 Milling and Paving
Infrastructure
Results
$5,115 CJ est. value
Kalispell, MT 59901

Commercial Plant Mix Material as Needed Libby
Term Contract
Post-Bid
Libby, MT 59923

Last Updated 04/25/2023 12:18 PM
Project Title

Gregson Interchange - Nissler Interchange

Physical Address View project details and contacts
City, State (County) Billings, MT 59106   (Yellowstone County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $13,170,595 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 25 the project was awarded to JEFFERY CONTRACTING LLC for $13,170,594.81. NHFP 90-4(82)211 - Pavement Preservation project to mill and fill full width the I-90 eastbound and westbound lanes, interchange ramps, crossroads at the Gregson Interchange, Ramsay Interchange and Nissler Junction to a depth of 0.20ft. and replaced with 0.20 ft. plant mix surfacing. This project will also include a seal and cover, bridge work, MASH compliant guardrail, rumble strips, new cattleguards, pavement markings and updated signing. The project is located 4.2 miles west of Butte on I-90. The project begins west of the Fairmont Interchange (RP 211.1) and proceeds 8.5 miles east to the Nissler Interchange (219.2). HSIP STWD (657) - Nissler Interchange - NB to WB loop ramp (121.6 to 121.95): replace existing speed advisory sign with solar powered radar speed feedback sign, install linear delineation on barrier in curve. WB to SB ramp: install chevrons and shoulder rumble strips through curve. This project is under the jurisdiction of the Butte District Administrator. Uniform No. 9465000, 9465000 MTDOT - 101 - Gregson Interchange - Nissler Interchange

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents