Similar Projects
Dock Expansion - Phase II
Addition, Infrastructure - 21,000 SF
Design
Pharr, TX

Phase 1 South Trail, North Loop Trail, Leonabelle Turnbull Board Walk
Infrastructure
Bidding
Port Aransas, TX 78373

OC1 and OC3 Dock Construction (Jefferson)
Infrastructure
Bidding
Beaumont, TX

Lake Houston Boat Ramp Replacement Services
Post-Bid
Houston, TX 77251

Derelict Vessel Removal Services
Post-Bid
Austin, TX 78701

Sources Sought for Access Dock Fire Pump and Pier Repairs - Maritime Administration Beaumont Reserve Fleet
Results
Beaumont, TX 77705

Construction Manager-At-Risk for a Rollover Recreational Area Pier on the Bolivar Peninsula in Galveston County, Texas
Results
Less than $200,000 est. value
TX

Southeastern Freight Lines
Renovation
Construction
El Paso, TX 79907

Pier 10 Redevelopment / Pier 10 and 12 Dock Repairs
Infrastructure
Post-Bid
$5,500,000 est. value
Galveston, TX

Beachside Redevelopment at Galveston Island State Park
New Construction
Results
$11,625,000 to $13,440,000 est. value
Austin, TX 78744

Pier 39-40 Mooring Modifications
Infrastructure
Post-Bid
Galveston, TX

Ancel Brundrett Memorial, Robert`s Point Park and Charlies Pasture Pier Reconstruction Hurricane Harvey Repairs
Results
Port Aransas, TX 78373

Berth 6 Expansion Project
Infrastructure
Post-Bid
Port Arthur, TX

Bulk Dock 1 West Trestle Beam Repairs
Results
Corpus Christi, TX 78403

Sylvan Pier Repair
Infrastructure
Post-Bid
La Porte, TX

Reported 02/08/2022 12:00 AM
Project Title

324 Huff Street Harbor Safety and Enforcement Office Docks

Physical Address View project details and contacts
City, State (County) Aransas Pass, TX 78336   (Aransas County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work is to construct dockage and boat lifts at the Harbor Safety & Enforcement Office (324 Huff St.). The dockage along the bulk head shall be no less than 8 feet wide, with the cat walks being no less than 6 feet wide. The dockage will include 2 lifts for the department vessels which are 23.5 feet in length. The dockage will include plumbing to attach at least 2 water outlets to allow for washdown. A decontamination shower shall be placed under the landing leading out of the bulkhead. The dockage shall include overhead led lighting to facilitate low light - no light operations and at least 2 Covered outdoor GFCI electrical outlets. The dockage shall include a ladder at the end of a catwalk with a weight rating to facilitate a fully dressed out diver (600lbs). The vendor is responsible for running and securing electricity. A chain link fence shall be installed along the bulkhead with a gate over the walkway to ensure security of the department assets.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents