Similar Projects
CPS Lindblom Math and Science HS MEP
Renovation, Alteration
Bidding
$10,000,000 est. value
Chicago, IL 60636

Renovate Residences Plumbing - Remod & Rehab
Alteration
Bidding
Less than $250,000 est. value
Chicago, IL

ABS Grinder Pumps
Term Contract
Post-Bid
Less than $25,000 est. value
Maywood, IL 60153

Plumbing Supplies
Post-Bid
Chicago, IL

Public Library Courtyard Fountain
Results
Prospect Heights, IL 60070

Pipe Leak Repair Goode HS
Results
Chicago, IL 60652

CPS Morton High School MEP
Renovation, Alteration
Bidding
Chicago, IL 60612

BRL MEP Upgrades - Division 01
Renovation
Post-Bid
Chicago, IL 60612

MEP Christopher ES
Results
Less than $6,000,000 est. value
Chicago, IL 60632

Saucedo Academy Tunnel Piping Repairs
Renovation, Alteration
Bidding
Chicago, IL 60623

Outpatient Care Center (OCC) MRI#2 Replacement - Division 01
Post-Bid
Chicago, IL 60612

Healy ES MEP & Holden ES Roof
Results
Chicago, IL 60608

Foresight Children Learning Center
Renovation
Post-Bid
Chicago, IL 60638

Municipal Center Valve Replacement
Renovation
Results
Glenview, IL 60026

CTE Dust Collector at Prospect HS
Post-Bid
Mount Prospect, IL

Reported 02/19/2022 12:00 AM
Project Title

Private Side Lead Service Line Replacement Plumber

Physical Address View project details and contacts
City, State (County) Evanston, IL   (Cook County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Prequalifying Requirements 1. Licensed, Bonded, and Insured (certificate of Insurance, insurance endorsements) 2. Registered plumber with the State of Illinois 3. Registered contractor and vendor with the City of Evanston 4. Twenty prior successful service line replacements using trenchless technology/methods in Evanston and Chicagoland area. 5. Install water service using trenchless technology/methods. 6. Make necessary excavations to install water service 7. Backfill all excavations to grade after work 8. Remove all spoils from job site 9. Install heavy wall “K” 1 ½” copper water supply piping (Unless instructed otherwise by City of Evanston) 10. Connect new water service line to new curb-stop in parkway 11. Install full port ball valves on both sides of the water meter(New water meter and couplings will be provided by City of Evanston) 12. New water service shall be connected to existing water supply lines in the home. 13. Water service line will be mounted in basement (If necessary) 14. All holes/excavations made in the home shall be sealed watertight. 15. The new water line will be pressure tested assuring a leak tight installation. 16. All fixtures and faucets will be cleared of debris to ensure proper operation. 17. Apply for all necessary permits 18. Arrange and attend meetings with city inspectors. 19. Restore any damage to lawn/landscaping. 20. The installation shall be complete, but does not include interior patching, painting or other cosmetic cover up should it be found necessary. 21. Contractor shall provide a quote to the City to complete each replacement within seven days of survey the property inside and outside (property owner or tenant must sign the City’s Right of Entry and Release form prior to the contractor and City surveying the interior of the property). 22. The replacement must be scheduled and completed within 14 days of submitting their quote to the City if chosen (weather permitting)

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents