Similar Projects
Pond and Drainage System Construction
Bidding
De Pere, WI

Erie Street Reconstruction and Utility Relay
Bidding
De Pere, WI

Temporary Bypass Road Contract
Post-Bid
Less than $126,000 est. value
Hobart, WI 54155

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Manitowoc - Green Bay, SCl - NCl
Results
Green Bay, Manitowoc, WI 54220

Statewide Pavement Maintenance 2021-2022
Term Contract
Bidding
Less than $5,000 est. value

Crackfilling
Post-Bid
De Pere, WI

2021 Street and Utility Improvements Bohemia Drive, Hager Road, and Schleis Lane
Results
Denmark, WI 54208

Pavement 3-21 South Jackson Street Reconstruction
Bidding
Green Bay, WI 54301

Green Isle Park Paving
Post-Bid
$300,000 est. value
Allouez, WI 54301

Edmund Pond Reconstruction
Results
New Franken, WI

South Bay Shore Dike Reinforcement – Segements 20 – 22
Bidding
Green Bay, WI

HMA Paving
Post-Bid
Howard, WI

2021 Resurfacing
Results
Green Bay, WI

Last Updated 01/13/2021 11:41 PM
Project Title

V. Bellevue, Manitowoc Road, Allouez Avenue - Kewaunee Road

Physical Address View project details and contacts
City, State (County) WI   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Local Street; 1.440 Miles; Grading, Base, Asphalt Pavement, Storm Sewer, Concrete Driveway, Curb and Gutter, Sidewalk, Box Culvert Extension, Chain Link Fence, Pavement Markings, and Signs Excavation Common, 5,128 CY; Backfill Structure, 695 Ton; Base Aggregate Dense, 6,883 Ton; Breaker Run, 50 Ton; Concrete Masonry Culverts, 81 CY; Bar Steel Reinforcement, 5,270 Lbs; Bar Steel Reinforcement Coated, 4,930 Lbs; Marking Epoxy, 34,436 LF; Construction Staking, 39,878 LF; Construction Staking, 30 Each; Construction Staking, 1 LS; Storm Sewer Pipe Reinforced Concrete, 64 LF 12“; Concrete Curb, 184 LF; Concrete Curb and Gutter, 15,748 LF; Concrete Sidewalk, 59,491 SF; Asphaltic Surface, 88 Ton; HMA Pavement, 8,016 Ton; Tack Coat, 2,440 Gals; Signs, 321 SF; Concrete Driveway, 5,406 SY; Storm Sewer Pipe 18”, 12 LF; Storm Sewer Pipe Composite 8” 829 LF, 12” 115 LF, 6” 61 LF; Chain Link Fence, 232 LF.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents