Similar Projects
Murphy #6931 / Ft. Wayne
Demolition, New Construction, Infrastructure - 2,800 SF
Conception
$1,500,000 CJ est. value
Fort Wayne, IN 46802

ExUrban
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Fort Wayne, IN 46802

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

Hunters Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fort Wayne, IN 46845

RFQ Contractor - Build West Tower Construction Fort Wayne
New Construction, Renovation, Infrastructure - 27,000 SF
Bidding
$20,000,000 CJ est. value
Fort Wayne, IN 46805

2022 Resurfacing Package Southeast
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Wayne, IN 46802

Furnish and Install Traffic PaveĀ­ment Markings on Various Roads in Allen County
Infrastructure
Post-Bid
Fort Wayne, IN 46802

FWCS 2022 Site and Traffic PPI
Infrastructure
Results
Fort Wayne, IN

The Pearl Phase I - Site Utilities
Infrastructure
Results
$562,588 CJ est. value
Fort Wayne, IN 46807

RFP Construction Manager - East Terminal Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Construction
$7,000,000 CJ est. value
Fort Wayne, IN 46809

Isabelle Gardens
New Construction, Infrastructure
Construction
$5,000,000 CJ est. value
Fort Wayne, IN 46805

RFP Design Architectural and Engineering Services for the Expansion and Renovation of Levan R. Scott Academy
Addition, Renovation, Infrastructure
Pending Verification
$670,000 CJ est. value
Fort Wayne, IN 46806

North River Development
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Fort Wayne, IN 46802

Bridge Thin Deck Overlay - SR 101
Infrastructure
Conception
$549,826 CJ est. value
Woodburn, IN 46797

Premier Riverfront Property
New Construction, Infrastructure - 60,000 SF
Design
$70,000,000 CJ est. value
Fort Wayne, IN 46802

Last Updated 02/19/2024 02:31 PM
Project Title

RFP Construction Manager - Music Center Addition Project

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46802   (Allen County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Contract Award, Construction start expected September 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $22,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 19, 2024 this project was awarded to Weigand Construction but the awarded amount is not available. The Trustees of Purdue University will solicit and interview prospective CMc firms for the Purdue Fort Wayne Music Center Addition Project. The RFP process will consist of two stages. The first stage (RFP-A/B) will be a qualifications based review. From these responses, firms will be shortlisted to proceed to the next stage. The second stage (RFP-C) will consist of interviews. Purdue University intends to evaluate potential CMc's qualifications for the construction of the Purdue Fort Wayne Music Center Addition Project. This project is anticipated to be completed as a single phase construction.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents