Similar Projects
Last Updated | 07/25/2023 11:02 AM |
Project Title | Generator Upgrade Project |
Physical Address | View project details and contacts |
City, State (County) | Placerville, CA 95667 (El Dorado County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,343,129 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. These specifications describe the minimum requirements for a skid mounted, standby duty, three phase, turbocharged with aftercooler engine driven electric generator powered from Diesel fuel. A larger generator shall be supplied when necessary to meet the requirements of this section. Section 16210 Appendix "B" contains the "Generator Data Form" which lists the minimum sizing for the generator and accessories. The manufacturer (or manufacturer's representative) shall fill in form with proposed values and include this form with the generator submittal. B. The engine generator shall include a diesel engine, control and instrument panel, batteries, battery charger, brushless alternator, exciter, voltage regulator, generator main breaker, sub-base integrated tank, fuel pump, radiator, blower fan, exhaust silencer, vibration isolator(s) Where bidder does not indicate discount payment terms in its bid, the District will take it to mean that bidder does not offer discount payment terms, and therefore the payment will be considered due Net 30 days after receipt of invoice. Question Deadline 07/07/2023 at 3:00 PM PT |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |