Similar Projects
Last Updated | 10/27/2022 03:06 PM |
Project Title | Construction of New Water Lines on Goff Ridge Road Contract I |
Physical Address | View project details and contacts |
City, State (County) | Baxter, TN 38544 (Putnam County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected April 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $601,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of October 27, 2022 this project has been cancelled.** Sealed Proposals for the furnishing of all labor, equipment and services for the construction of new water lines on Goff Ridge Road. The bidder shall be responsible for their early delivery. The work shall be paid for using available local funds. The work is to be bid in one (1) Contract and consists of the following approximate quantities together with all necessary appurtenances. CONTRACT I The work to be performed under this Contract consists of labor only for the construction of approximately: 7,225 linear feet of 6-inch water line and other appurtenant work as shown on the Plans and described in the Specifications. Special Conditions The OWNER shall provide all material, gravel, and asphaltic pavement required for this contract. The Contractor shall bid Labor Only for each of the pay items with the following exceptions: 1) The Contractor shall provide clean-up for the entire project including seed and straw (at his expense); 2) The Contractor shall provide the Class C concrete required for the kickers constructed as per the details on the plans. Sackcrete will not be accepted. All bidders must be licensed general contractors as required by the Contractors Licensing Act of 1976 of the General Assembly of the State of Tennessee, and qualified for the type of construction being bid upon. Each bidder shall write on the outside of the envelope containing his bid (1) his contractors license number, (2) the license expiration date, and (3) that part of the classification applying to the bid. If this is not done, the bid will not be opened. Bids shall be accompanied by a certified check or bid bond in an amount equal to five percent (5%) of the bid to ensure the execution of the Contract for which such bid is made. In case the bid is not accepted, the check or bid bond will be returned to the bidder, but if the bid is accepted and the bidder shall refuse or neglect to enter into a Contract with Cookeville Boat Dock Road Utility District, Putnam County, Tennessee, within ten (10) days from the time he shall be notified of the acceptance of his bid, the said check or bid bond shall be forfeited to Cookeville Boat Dock Road Utility District, Putnam County, Tennessee, as liquidated damages for the failure to do so. The successful bidder or bidders will be required to furnish an acceptable performance bond and payment bond each in the amount of one hundred percent (100%) of the Contract price. Liquidated damages in the amounts set out in the Specifications and Contract Documents will be assessed for failure to complete the work within the contract completion time as specified herein. The bidder shall submit an affidavit stating that he as a company has a drug and alcohol testing program at least as stringent as that of the program operated by the governmental entity. All as required by the Tennessee Drug-Free Workplace Act. A copy of the owners program is available for review at either the Owners office or the Engineers office. The Owner reserves the right to reject any and all bids, and to waive any informalities, and to negotiate with any and all bidders. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |