Similar Projects
Quilt Block Mastication
Infrastructure
Bidding
$100,000 est. value
Sandpoint, ID

Sub-Agency Housing Project
Infrastructure
Post-Bid
Plummer, ID 83851

Bull Meadow Sage-Grouse Habitat Improvement
Infrastructure
Bidding
$400,000 est. value
Boise, ID

Prime Earth Pit Reclamation
Infrastructure
Bidding
Eagle, ID 83616

Helical Pier Construction
Infrastructure
Results
Malta, ID 83342

Kendrick High School Concessions and Locker Room
Renovation, Addition, Alteration
Post-Bid
Kendrick, ID

Reported 04/20/2022 12:00 AM
Project Title

Spring Valley Phase 1 Grading

Physical Address View project details and contacts
City, State (County) Eagle, ID   (Ada County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Grading and earthwork for Phase 1 of the Spring Valley Development, a master planned development in Eagle, Idaho. The project is located east of State Highway 16 and generally extends to the northeast along the Big Gulch Creek. Major components of the project are summarized below. Grading of major roadways within Phase 1 including: Big Gulch Parkway, Linder Road, and Aerie Way Grading to subgrade for the extension of Aerie Way from Phase 1 to State Highway 16 including all stormwater infrastructure and required erosion protection. Construction of the major stormwater conveyance and storage infrastructure including Big Gulch Wash and the BLM Detention Pond. This will include temporary culvert crossings, detention pond outlet infrastructure, and all required erosion protection. Earthwork construction of the Wastewater Treatment Plant site including the winter storage lagoons. Construction of site access via the Farmer's Union Canal Crossing near State Highway 16 including all earthwork, utility crossings, box culvert, and erosion protection. Construction of access and staging infrastructure including a gravel access road extending southwest along Big Gulch from Willow Creek Road to the material staging site, and the construction of the material staging site.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents