Similar Projects
Last Updated | 09/09/2021 10:22 AM |
Project Title | Contract for TRN-2021-1 TSplost Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | East Point, GA (Fulton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Scope of Work for this project consists of resurfacing along Harris Street, Bryan Avenue, R.N. Martin Street, Hogan Road, and Dogwood Drive. Construction services will include variable depth milling, milling to a maximum depth of 1.5 inches, and milling to a maximum depth of 2 inches on select streets in accordance with the plans. Services will also include patching and leveling with Incl Bitum Matl & H Lime, and 9.5 mm and 12.5 mm Superpave for the surface course for each street. All existing ramps shall be upgraded in compliance to ADA standards. Damaged drainage structures shall also be reconstructed throughout the project. The project constraints are displayed in the final plans set. - The location for this Work / Project is: [Harris Street, Bryan Avenue, R.N. Martin Street, Hogan Road, and Dogwood Drive, East Point, Georgia 30344] |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |