Similar Projects
Scheduled and Emergency Bridge Deck Repairs and Related Work at Various Locations
Bidding
Less than $923,540 est. value

Wearing Surface Repairs and Related Work (Including Painting) BR No. W-44-098 (Steel) Interstate 190 (NB and SB) Over the P and W Railroad
Bidding
Less than $3,695,290 est. value
Worcester, MA

Scheduled and Emergency Drawbridge Operation, Maintenance and Repairs at Various Locations
Post-Bid
Less than $5,090,000 est. value

Scheduled and Emergency Bridge Steel Beam Repairs (including Painting) at Various Locations Excluding the Islands
Results
Less than $1,539,000 est. value

Replacement of Fisher Street Bridge over Assabet River
Results
$1,100,000 est. value
Westborough, MA 01581

Queen Lake Road Bridge Rehabilitation Project
Bidding
$500,000 est. value
Phillipston, MA 01331

Bridge Structural Repairs and Related Work (Including Painting) along Interstate 495
Results
Less than $2,765,000 est. value

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Bidding
$1,847,645 est. value

Scheduled and Emergency Bridge Deck Repairs at Various Locations on Interstate 90
Results
Less than $2,351,000 est. value

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
Results
Less than $1,489,000 est. value

Scheduled and Emergency Structural Repairs at Various Locations
New Construction
Bidding
$1,459,640 est. value

Bridge Structure Repairs (Including Painting) at Various Locations
Results
Less than $960,000 est. value

Scheduled and Emergency Bridge Structural Repairs at Various Locations
Results
Less than $1,267,525 est. value

Scheduled and Emergency Bridge Deck Repairs and Related Work at Various Locations
Results
Less than $2,247,400 est. value

Last Updated 10/23/2020 11:44 AM
Project Title

Old South St. Bridge Repairs, Westville Lake, Sturbridge, MA

Physical Address View project details and contacts
City, State (County) Sturbridge, MA   (Worcester County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair the deck expansion joint: -Blast clean the deck expansion joint steel plates -Maintenance paint the expansion joint steel plates -Remove neoprene drainage trough -Place elastomeric joint sealant Paint the Steel Girder Ends and Expansion Bearings at the South Abutment: -Blast clean the steel girder ends and expansion bearings at the south abutment -Maintenance paint the steel girder ends and expansion bearings at the south abutment -Each girder shall be blast cleaned and painted for the first five feet of each girder's length as measured from south end

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents